Herunterladen Inhalt Inhalt Diese Seite drucken

Toshiba MM-U056 Installationsanleitung Seite 10

Modular multi system
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 66
Unit Installation – MM-B Units continued
Connection of Ducting
Supply duct
(local procurement)
GB
Remove the duct connection assembly (attachment)
!
before connecting the supply duct.
The maximum length of
!
flexible ducting is 10m.
G
To connect the shelter
board under the lower air
inlet of unit, prepare the
shelter board locally, as
shown below.
Shelter Board
4 x Ø6 holes
Model (MM-)
B056
B080
B112, B140
G
To connect square duct, prepare the connection flange
locally as shown below:
Supply Flanges
MM-B056
Optional Accessory
G
A TOSHIBA Long-Life Filter Kit is available as an
optional accessory.
G
The Filter Kit can be installed on either the lower or
rear air inlet of the Duct Type unit.
I
NDOOR
Return duct (local
procurement)
Shelter board
(local procurement)
Flexible duct
C x Ø6 holes
A
B
C
400
700
700
1000
2
1050
1350
2
12 – ø 6 holes
U
L
NIT
OCATION
Supply Flanges Continued
MM-B080
MM-B112, MM-B140
Return Flanges
MM-B056
MM-B080
MM-B112, MM-B140
~ 10 ~
14 – ø 6 holes
14 – ø 6 holes
14 – ø 6 holes
18 – ø 6 holes
22 – ø 6 holes

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis