Herunterladen Inhalt Inhalt Diese Seite drucken

Leak Check; Operation; Maintenance - GOK ODR Bio Montage- Und Bedienungsanleitung

Öldruckregler
Vorschau ausblenden Andere Handbücher für ODR Bio:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Risk of injuries due to blown-out metal chips!
Metal chips may cause eye injuries.
Wear safety goggles!
Malfunctions caused by residues! Proper functioning is not guaranteed.
Visually check that there are no metal chips or other residues in the connections!
It is important that metal chips or other residues are blown out!
Install with suitable tools, if required.
Regarding screw connections, use a second spanner to brace against the connection nozzle.
Do not use unsuitable tools, such as pliers.
Product damaged through incorrect installation direction
Proper functioning is not guaranteed.
Observe the installation direction (marked on the housing with an arrow

10.LEAK CHECK

Check the condition of the system:
• before initial start-up,
• after major changes,
• after repairs,
• after the system has been out of operation for more than one year.
11. START-UP
With the adjustable oil pressure regulators, the required outlet pressure has to be set.
Observe the permitted operating pressure of downstream fittings and consuming devices.
Type
Adjust the outlet pressure by
ODRE
regulator cover
ODRE-M
T-screw
After installation and start-up, apply weather-sealing paint.

12. OPERATION

The product requires no operation while it is running.

13. MAINTENANCE

Upon proper ASSEMBLY and OPERATION, the product is maintenance-free.
Item No. 13 504 50 f
and scale
with display on the pressure gauge
1-17m oil column
)
locking in place using
the
Set screw
Locknut
5 / 6

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Odr seriesOdrOdreOdre-m

Inhaltsverzeichnis