Herunterladen Inhalt Inhalt Diese Seite drucken

Installation To Double Wood Stud Wall - PEERLESS Smartmount D-FPF-220 Anbringung Und Zusammenbau

Vorschau ausblenden Andere Handbücher für Smartmount D-FPF-220:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation to Double Wood Stud Wall

• Installer must verify that the supporting surface will safely support the combined load of the equipment and all
attached hardware and components.
• Tighten wood screws so that wall plate is firmly attached, but do not overtighten. Overtightening can damage the
screws, greatly reducing their holding power.
• Never tighten in excess of 80 in. • lb (9 N.M.).
• Make sure that mounting screws are anchored into the center of the stud. The use of an "edge to edge" stud finder is
highly recommended.
• Hardware provided is for attachment of mount through standard thickness drywall or plaster into wood studs.
Installers are responsible to provide hardware for other types of mounting situations (not UL approved).
Use a stud finder to locate the edges of the studs. Use of an edge-to-edge stud finder is highly recommended.
1
Based on their edges, draw a vertical line down each stud's center. Place wall plate on wall as a template. The
top mounting slots should be located 4.07" (103 mm) above the desired screen center as shown in figure 1.1.
Level plate, and mark the center of the four mounting holes. Make sure that the mounting holes are on the stud
centerlines. Drill four 5/32" (4 mm) dia. holes 2.5" (64 mm) deep. Make sure that the wall plate is level, secure it
using four #14 x 2.5" wood screws (CC) as shown in fig. 1.2.
Skip to step 2.
STUD
(103 mm)
AA
CS = center of screen
4.07"
CS
fig. 1.1
WARNING
CC
4 of 34
AA
ISSUED: 09-07-07 SHEET #: 202-9223-2 05-07-09
fig. 1.2

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis