Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly And Installation - Ritter MultiSchneider AES 62 SL Gebrauchs- Und Montageanleitung

Einbausystem für schubkasten
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Assembly and installation

The last few pages of these
operating instructions contain
drawings with assembly and
installation dimensions.
Please note that the installation
dimensions differ depending on
the appliance version ("SR" or
"SL") (Figs 3)!
Safety instructions
– Assembly must be performed
by qualified personnel only.
ritterwerk will not be held
liable for the consequences of
any improper and/or incorrect
assembly.
– The mains cable must be
designed such that the
appliance can be swivelled
fully in without jamming the
appliance. The mains cable
must be routed straight from
the installation system to the
socket that is to be mounted
in the floor cabinet.
– Remove the mains plug from
the socket before assembly.
Installation conditions
Body width: ............ min. 450 mm
Clearance height for drawer
base / crossbeam:
– without baseplate: ....... 75 mm
– with baseplate: ............ 83 mm
Clearance for drawer for worktop
front edge / inner edge and
drawer cover: ................. 365 mm
(Without mounted finger protec-
tor and left-over holder)
Clearance for width (usable)
Drawer base: ................. 335 mm
Appliance width: ............ 345 mm
The drawer base should be at
least 16 mm thick.
For a 45 cm body width, the
inclined formation of the side
frames could mean that the
width clearance (usable) of the
drawer base is a few millime-
tres too small. Mounting it on to
baseplates (15, Fig. 1) enables
up to 4 mm to be gained in terms
of width.
At a nominal length of 400 mm
the drawer's roller guide should
have a static loadability of at least
40 kg.
Mounting the socket
• Mount a surface-mounted
socket in accordance with VDE /
DIN 49440, ÖVE, SEV to the rear
panel or the side of the body (see
Fig. 2).
The connection between the
socket and the mains cable
should be routed under the rear
crossbeam or the upper base and
as far up as possible in the rear
corner of the floor cabinet.
The drawer must be capable of
being slid all the way in when the
mains cable is plugged in.
Mounting multi slicer
Preparation:
• Pull the drawer out up to the
stop.
• Determine the position for the
multi slicer in accordance with the
assembly drawing (see Fig. 3).
or
• Position the appliance, when
folded, into the drawer (see
Fig. 3).
The distance between the front
edge of the worktop and the
completely screwed-in buffer
screw (12) should be approx.
5 mm.
• Mark the position of the front
and rear fastening brackets
determined in this manner on the
base of the drawer.
• Remove the appliance from
the drawer.
Execution:
• Drill the four holes as marked
for assembling the appliance
onto the base of the drawer.
• Mount the appliance using
four pan-head screws 3.5 x 16
(for drawer base 16 mm).
Mounting retaining brackets
• Position the retaining brack-
ets (7) and (8) as shown in
Fig. 3.
• Check the position by placing
the finger protector and the left-
over holder onto the correspond-
ing retaining bracket (Fig. 4).
• Mark the position of the holes
and then drill them.
• Mount the two retaining brack-
ets using countersunk screws
(Phillips drive) PZ 3.5 x 12 (for
drawer base 16 mm).
Adjusting appliance position
• Position the appliance as
described in INITIAL START-UP.
• Turn the buffer screw (12)
until it just makes contact with
the front edge of the worktop
(do not clamp tight!).
• Check the setting by folding
and unfolding it several times in
succession.
Note:
All dimensions in the assembly
drawings stated in mm!
English
13

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Multischneider aes 62 srAes 62 slAes 62 sr

Inhaltsverzeichnis