Herunterladen Inhalt Inhalt Diese Seite drucken

Haier AP48KS1ERA Bedienungsanleitung Installationsanleitung Seite 21

Unitary smart säule
Vorschau ausblenden Andere Handbücher für AP48KS1ERA:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 83
Installation Procedure
Installation inspection and test run:
Please operate unit according to this Manual.
Items to be checked during test run. Please made a " " in " "
Are there any gas leakage?
How is insulation at piping connection carried out?
Are electric wires of indoor and outdoor unit firmly inserted into terminal block?
Is electric wiring of indoor and outdoor securely fixed?
Is drainage securely carried out?
Is earth line ( grounding ) securely connected?
Is power supply voltage abided by the code?
Is there any noise?
Is control display normal?
Is cooling operation normal?
Is room temp. regulator normal?
19
Test Run

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ap60ks1eraAp48ds1era

Inhaltsverzeichnis