Herunterladen Inhalt Inhalt Diese Seite drucken

EINHELL Alustar II Montageanleitung Seite 23

Vorschau ausblenden Andere Handbücher für Alustar II:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Assembly and safety notes / Tool list
GB
Dear Customer,
Thank you for choosing an Einhell product. We hope
that you enjoy using your greenhouse. Much time went
into designing this aluminum greenhouse, the profiles
of which are quite robust. The compact, modular design
allows for quick assembly.
Be sure to thoroughly read the assembly instructions
prior to erecting your greenhouse in order to avoid
making any mistakes or causing damage. On the
following pages, you will find accompanying text and
important notes on the individual assembly steps in
the German instructions. Store the instructions in a safe
place after assembly.
Aluminum profiles:
Identify the aluminum profiles prior to assembly using
the profile cross sections and profile lengths shown in
the individual parts list.
Web panels (plastic):
The bonded side or side labeled „Außenseite/Outside"
on the edge is the outside of the web panel (with UV
coating). Always pull only the film from the web panel
that you are currently assembling.
Tool list
You will require the following assembly tools:
Socket wrench
WAF 10
Tape measure
or yard stick
Important:
!
There are extra nuts and bolts in all bags of assembly parts.
When erecting the greenhouse, ensure that the profiles are perpendicular to each other. Always check the
horizontal and vertical positioning of the profiles using a water level. Ensure that all web panels are pushed all
the way into the profile grooves.
2
AluStar_INT_Titel+GB.pmd
Drill Ø 2.0 mm
Phillips screwdriver
(size 2-3)
Drilling machine or
Water level
cordless screwdriver
2
Important safety notes on installation
•We recommend that you perform assembly with the help
of a second person.
•In order to avoid accidents, no children should be in the
immediate vicinity during assembly.
•Wear safety gloves when assembling the aluminum
profiles! Risk of cuts/crushing!
•When installing web panels, be sure to wear safety
gloves, safety goggles and safety shoes. Risk of
injury / breakage!
•After you have completely assembled the greenhouse,
retighten all screw connections using the open end or
box wrench.
Note
The manufacturer will not be held liable for damage due to
storms, wind, water or snow. No warranty will be assumed
for the compensation of consequential damage and
financial loss. We reserve the right to incorporate further
developments as a result of technological advancement.
This may lead to minimal deviations in the illustrations.
Components with recognizable damage must be replaced
using original replacement parts. You will find a complete
individual parts list on page 5 of the German assembly
instructions.
Please dispose of packaging material at your local
recycling facility.
Masonry drill
Safety easel
10.01.2006, 18:01
Open end or box
wrench (WAF 10)

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Alustar iiiAlustar i

Inhaltsverzeichnis