6. Commissioning, operation
6. Commissioning, operation
CAUTION!
Prior to commissioning, the pressure transmitter must be subjected to a visual inspection.
GB
Leaking fluid is indicative of damage.
■
Only use the pressure transmitter if it is in perfect condition with respect to safety.
■
CAUTION!
The model O-10 (T) pressure transmitter must not be exposed to any condensation.
6.1 Mechanical mounting
Required tool: Open-ended spanner (spanner width 24)
The sealing faces at the instrument have to be undamaged and
■
clean.
When screwing the instrument in, the force required to do this
■
must not be applied through the casing, but only through the
spanner flats provided for this purpose and using a suitable tool.
When screwing in, do not cross the threads.
■
For information on tapped holes and welding sockets, see
■
Technical information IN 00.14 at www.wika.com.
22
WIKA operating instructions pressure transmitter model O-10
Spanner flats