Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning, Operation; Mechanical Mounting - WIKA O-10 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für O-10:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

6. Commissioning, operation

6. Commissioning, operation
CAUTION!
Prior to commissioning, the pressure transmitter must be subjected to a visual inspection.
GB
Leaking fluid is indicative of damage.
Only use the pressure transmitter if it is in perfect condition with respect to safety.
CAUTION!
The model O-10 (T) pressure transmitter must not be exposed to any condensation.

6.1 Mechanical mounting

Required tool: Open-ended spanner (spanner width 24)
The sealing faces at the instrument have to be undamaged and
clean.
When screwing the instrument in, the force required to do this
must not be applied through the casing, but only through the
spanner flats provided for this purpose and using a suitable tool.
When screwing in, do not cross the threads.
For information on tapped holes and welding sockets, see
Technical information IN 00.14 at www.wika.com.
22
WIKA operating instructions pressure transmitter model O-10
Spanner flats

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis