Drainage Piping Work - Mitsubishi Electric PLA-RP60 BA Installationshandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 20
4. Installing the refrigerant piping
,
Fig. 4-3

5. Drainage piping work

Max. 20 m
1.5 - 2 m
Fig. 5-1
(mm)
11
25
25
25
Fig. 5-2
6
4.3. Indoor unit (Fig. 4-3)
Heat insulation for refrigerant pipes:
1 Wrap the enclosed large-sized pipe cover around the gas pipe, making sure
Refrigerant pipe and
insulating material
2 Wrap the enclosed small-sized pipe cover around the liquid pipe, making sure
Pipe cover (large)
Pipe cover (small)
3 Secure both ends of each pipe cover with the enclosed bands. (Attach the
Refrigerant pipe (gas)
Refrigerant pipe (liquid)
• After connecting the refrigerant piping to the indoor unit, be sure to test the pipe
Band
connections for gas leakage with nitrogen gas. (Check that there is no refrigerant
Cross-sectional view of connection
leakage from the refrigerant piping to the indoor unit.)
Pipe
Insulating material
4.4. For twin/triple combination
Squeeze
Refer to the outdoor unit installation manual.
5.1. Drainage piping work (Fig. 5-1)
• Use VP25 (O.D. ø32 PVC TUBE) for drain piping and provide 1/100 or more
downward slope.
• Be sure to connect the piping joints using a polyvinyl type adhesive.
• Observe the figure for piping work.
• Use the included drain hose to change the extraction direction.
Max. 15 cm
Grouped piping
1.Connect the drain socket (supplied with the unit) to the drain port. (Fig. 5-2)
(Fix the tube using PVC adhesive then secure it with a band.)
2.Install a locally purchased drain pipe (PVC pipe, O.D. ø32).
(Fix the pipe using PVC adhesive then secure it with a band.)
3.Insulate the tube and pipe. (PVC pipe, O.D. ø32 and socket)
4.Check that drain flows smoothly.
5.Insulate the drain port with insulating material, then secure the material with a
band. (Both insulating material and band are supplied with the unit.)
that the end of the pipe cover touches the side of the unit.
that the end of the pipe cover touches the side of the unit.
bands 20 mm from the ends of the pipe cover.)
Correct piping
1
Wrong piping
2
Insulation (9 mm or more)
A
Downward slope (1/100 or more)
B
O.D. ø32 PVC TUBE
D
Make it as large as possible
E
Indoor unit
F
Make the piping size large for grouped
G
piping.
Unit
Drain pipe (O.D. ø32 PVC TUBE)
A
G
Insulating material
Insulating material (purchased locally)
B
H
Band
Transparent PVC pipe
C
I
Drain port (transparent)
O.D. ø32 PVC TUBE(Slope 1/100 or more)
D
J
Insertion margin
Drain socket
E
K
Matching
F
Support metal
C
Air bleeder
K
Raised
L
Odor trap
M
Downward slope (1/100 or more)
H
O.D. ø38 PVC TUBE for grouped piping.
I
(9 mm or more insulation)
Up to 85 cm
J