5. Refrigerant piping work
5.5. Purging procedures leak test
Connect the refrigerant pipes (both the liquid and gas pipes) between the indoor
and the outdoor units.
Remove the service port cap of the stop valve on the side of the outdoor unit gas pipe.
(The stop valve will not work in its initial state fresh out of the factory (totally closed
with cap on).)
Connect the gage manifold valve and the vacuum pump to the service port of the
stop valve on the gas pipe side of the outdoor unit.
Run the vacuum pump. (Vacuumize for more than 15 minutes.)
Check the vacuum with the gage manifold valve, then close the gage manifold valve,
and stop the vacuum pump.
Leave it as is for one or two minutes. Make sure the pointer of the gage manifold
valve remains in the same position. Confirm that the pressure gage show -0.101MPa
(-760 mmHg)
*Close
*Open
Hexagonal wrench
*4 to 5 turns

6. Drainage piping work

1
A
2
K
B
E
D
F
F
H
Downloaded from
www.Manualslib.com
Fig. 5-10
PURGING PROCEDURES
Compound pressure
-0.101MPa
Stop valve
gauge (for R410A)
(-760 mmHg)
Stop valve
Handle
Low
Stop
valve
Vacuum
Service port
pump
Window
Adapter for
Charge hose
preventing
(for R410A)
the back flow
Max. 20m
1.5–2m
C
B
L
M
Max. 150 mm
D
D
F
G
F
I
Fig. 6-1
manuals search engine
• Apply a thin coat of refrigeration oil on the seat surface of pipe. (Fig. 5-10)
• For connection first align the center, then tighten the first 3 to 4 turns of flare nut.
• Use tightening torque table below as a guideline for indoor unit side union joint section,
and tighten using two wrenches. Excessive tightening damages the flare section.
Copper pipe O.D.
(mm)
ø6.35
ø9.52
ø12.7
Warning:
Be careful of flying flare nut! (Internally pressurized)
Remove the flare nut as follows:
1. Loosen the nut until you hear a hissing noise.
2. Do not remove the nut until the gas has been completely released (i.e., hiss-
ing noise stops).
3. Check that the gas has been completely released, and then remove the nut.
Remove the gage manifold valve quickly from the service port of the stop valve.
After refrigerant pipes are connected and evacuated, fully open all stop valves on
gas and liquid pipe sides.
Operating without fully opening lowers the performance and causes trouble.
No gas charge is needed.
Tighten the cap to the service port to obtain the initial status.
Pressure gauge
(for R410A)
Gauge manifold
valve (for R410A)
Handle High
Charge hose
(for R410A)
(or the vacuum
pump with the
function to
prevent the back
flow)
6.1. Drainage piping work (Fig. 6-1)
• Use VP25 (O. D. ø32 PVC TUBE) for drain piping and provide 1/100 or more down-
ward slope.
• Be sure to connect the piping joints using a polyvinyl type adhesive.
• Observe the figure for piping work.
• Use the included drain hose to change the extraction direction.
1 Correct piping
2 Wrong piping
A Insulation (9 mm or more)
B Downward slope (1/100 or more)
Grouped piping
D O. D. ø32 PVC TUBE
E Make it as large as possible
F Indoor unit
G Make the piping size large for grouped piping.
H Downward slope (1/100 or more)
I O. D. ø38 PVC TUBE for grouped piping.
(9 mm or more insulation)
J Up to 500 mm
J
Flare nut O.D.
(mm)
17
22
26
Pipe length :
Pipe length exceeding 7 m
7 m maximum
Charge the prescribed
Retighten the cap
Leak test
C Support metal
K Air bleeder
L Raised
M Odor trap
Tightening torque
(N·m)
14 - 18
34 - 42
49 - 61
amount of gas.