INSTALLATION INSTRUCTIONS
GB
Docking
Volume increasing and reducing of heat spikes
49
120
81
89
VP1
This docking is used when the system volume is insufficient or to reduce heat spikes in the heating system. To elimi-
nate heat spikes in the heating system, a UKV tank is installed. Select diagonal connections (e.g. left up and right
down). Plug any connections that are not used. An automatic by-pass valve must be installed if there is a risk of poten-
tial 0-flow.
Volume increasing and reducing of heat spikes
RC
49
120
VP1
VVM 300
In cases where the system volume in the heating system is below 20 l/kW (heat pump output at 7/45°C) and/or the
flow is choked uncontrolled, a UKV tank (120) is installed as a volume and flow increaser. Plug any connections that are
not used. An automatic by-pass valve must be installed if there is a risk of potential 0-flow.
Note! These are outline diagrams. Actual installations must be planned according to applicable standards.