Herunterladen Inhalt Inhalt Diese Seite drucken

Hach LANGE BIOGAS Titrator Manager Basis Bedienungsanleitung Seite 71

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 39
Run a reagent calibration
Refer to Short-Form Reminder no. 5.
1.
Select the method.
2.
Install the reagent to be calibrated.
3.
Install the electrode group to be used to perform the calibration.
4.
Enter the Reagents menu.
5.
Select 1 Calibrate/Enter titre.
6.
Press the validation key.
7.
Select the reagent from the proposed list.
8.
Press 1 to start the calibration.
Run a method
Refer to Short-Form Reminder no. 6.
1.
Select the method.
2.
Install the electrode group to be used to perform the analysis.
3.
Install the reagent groups to be used to perform the analysis.
4.
Display the Main menu. and press 1 to start the analysis.
Run a sequence
Refer to Short-Form Reminder no. 7.
1.
Install the electrode group to be used to perform the analysis.
2.
Install the reagent groups to be used to perform the analysis.
3.
Display the Main menu.
4.
Press 3.
5.
Press 1.
6.
Prepare the sample stack.
7.
Display the Main menu and press 1 to start the analysis.
Run a direct measurement
Refer to Short-Form Reminder no. 8.
1.
Select the method.
2.
Install the electrode group.
3.
Display the Electrode menu.
4.
Press 2 to start the measurement.
5.
Select the electrode in the list.
Note: You can stop or start stirring by pressing 1.
English 71

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis