Herunterladen Diese Seite drucken

Nibe SPLIT Serviceanleitung Seite 21

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mounting
NOTE
All electrical connections must be carried out
by an authorised electrician.
Electrical installation and wiring must be car-
ried out in accordance with the stipulations in
force.
1.
Replace the gaskets, use the ones
supplied with the replacement
pump.
2.
Install the replacement pump. Note
that the outlet opening points
downwards.
3.
Reinstall the pipe to the pump.
4.
If an energy meter is not installed,
tighten all nuts, see (4a).
If an energy meter is installed,
tighten all nuts, see (4b).
| GB
NOTE
On the communication board (AA23), the
brown cable (signal) is connected to X1:1.
The blue cable is connected to X1:2.
3
4a
2
1
4b
3
4b
21

Werbung

loading