Herunterladen Inhalt Inhalt Diese Seite drucken

Presentation; Handling, Putting Into Operation - Conrad PS-403 Bedienungsanleitung

Druckmeßadapter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

opening, so that the sensitive membrane does not become da-
maged or destroyed.
-
with water or a weak, non-corrosive, non-combustible cleaning
agent.
then the unit must be switched off and protected against unin-
tentional Operation. lt tan be assumed that safe Operation is no
longer possible if:
it has been brought from a cold into a warm area. The resultant
strument to come to room temperature before switching it on.

Presentation

The Pressure Measuring Adapter was developed to enable pressu-
re and negative pressure to be measured easily, inexpensively and
relatively precisely. The measuring transducer of the Pressure Mea-
suring Adapter is screwed into a pressurised System with an appro-
priate 1/2" connector and the Pressure Measuring Adapter itself '
connected to a Voltmeter with 200 mV measuring range and an
input resistance of ideally IO MOhm. With Voltmeters with an input
resistance of from at least 1 MOhm up to 10 MOhm, an additional
measurement error of 0.5% must be reckoned with.
A changeover switch allows measurements either in metric or Bri-
tish/American units of measurement. Using a second switch, selec-
tion tan be made between positive pressure measurement in psi or
This measurement accessory will find universal application, for ex-
ample in food monitoring, air conditioning, cooling Systems, hy-
draulic Systems (limited to maximum pressure monitoring), motor
vehicle servicing, compressed air installations and so on.

Handling, Putting into Operation

A Inserting and changing the battety, testing the battery
Al Changing the battety
For the unit to function perfectly, the Pressure Measuring Adapter
must be fitted with a 9 V battery. If a voltage of less than approx.
100 mV is indicated when testing the Pressure Measuring Adapter
on a multimeter (as described below), the battery is to be replaced.
Proceed as follows:
from the Voltmeter and render the pressure System pressure-free
from the battery compartment cover,
le and
battery compartment and
ped.
9

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis