Herunterladen Inhalt Inhalt Diese Seite drucken

Getting Ready; Connecting Machine To Power Source; Changing The Bulb - Silvercrest SNM 33 B1 Bedienungs- Und Sicherheitshinweise

Vorschau ausblenden Andere Handbücher für SNM 33 B1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Getting ready

Connecting machine to power source

Connecting machine to power source

Changing the bulb

B
A
78
GB / IE
Important:
Unplug power cable when machine is
not in use.
Important:
Consult a qualified electrician if in doubt
about connecting the machine to the
power source. Unplug power cable if you
19
19
are not using the power supply.
The sewing machine must be used with
the ELECTRONIC foot pedal (t) KD-
2902/ FC-2902D (220-240V).
Connect the machine to a power source as
illustrated in the adjacent drawing.
Illumination
The machine is started and the light
switched on by pressing the main switch
(19) in position " l ".
Foot pedal
The operating speed of the machine is
regulated with the pedal (t).
Disconnect the machine from the power
supply by removing the plug from the mains
socket!
1. Loosen screw (A) as illustrated.
2. Remove the cover (B).
3. Unscrew the bulb (C) and fit a new one.
4. Replace the cover and tighten screw.
Should there be any problem, ask your
local dealer who will be able to advise
you.
C

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ian 274368

Inhaltsverzeichnis