Herunterladen Inhalt Inhalt Diese Seite drucken

WolfVision VZ-C12 Montageanleitung Seite 8

Vorschau ausblenden Andere Handbücher für VZ-C12:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INSTALLATION OF WOLFVISION'S CEILING MOUNT
Mounting the Visualizer on the ceiling using WolfVision's ceiling mount can be done very quickly and easily.
IMPORTANT!
The ceiling mount must be affixed directly with three steel anchors as illustrated in fig.1 to concrete to
ensure a secure mounting and operation of the Visualizer! Ensure that the ceiling construction is able to
carry a weight of 80 kg (176 pounds) and that possible collision accidents are prevented.
Direction
of the user
Ø 8
IMPORTANT: Please give special attention to the country specific regulations for
G
training and conferencing rooms.
G
IMPORTANT: Ensure solid mounting and secure connection of all parts to avoid the
possibility that the unit detaches itself from the ceiling.
fig.1
Direction
of the user
concrete
7
Final position of
Visualizer with
ceiling mount
mm
Inch
8
0.315
15
0.59
17
0.67
61
2.4

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Vz-c32

Inhaltsverzeichnis