Herunterladen Inhalt Inhalt Diese Seite drucken

WolfVision VZ-C12 Montageanleitung Seite 13

Vorschau ausblenden Andere Handbücher für VZ-C12:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

DISMANTLING OF THE CEILING VISUALIZER
Should it be required to dismantle the Ceiling Visualizer due to relocation or after sales service, please
follow the instructions outlined below.
Turn off the unit at the main switch and press the release button (fig.14).
Release the Visualizer to the opened holding position (fig.15).
Unplug all connected cables and remove them from the ceiling mount (fig.16).
Remove all cables completely from the ceiling mount.
Remove the ceiling mount once all cables are completely removed.
fig.16
fig.15
fig.14
Remove both Allen screws and stabilization ring (fig.17)
Press the safety lever to the top by using a normal slot screw driver (fig.18) and turn the lever to the centre
position by 60 degrees (the lever must click in pulled position).
The Ceiling Visualizer can not be removed without following this process.
fig.17
fig.18
Subsequently, the Visualizer must be moved back towards the ceiling and locked in place. The Visualizer
can now be removed by turning it by 90 degrees. Please take into consideration the weight of the unit
(13 kilos / 29 pounds) when detaching it from the ceiling. The safety lever will automatically reactivate
with the next installation and will secure the Visualizer from detaching itself.
12

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Vz-c32

Inhaltsverzeichnis