Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Before replacing the lamp, unplug mains lead and let the lamp cool down (approx. 20 minutes).
During the installation do not touch the glass-bulbs bare-handed! Please follow the lamp manufacturer's
notes!
Do not install lamps with a higher wattage! Lamps with a higher wattage generate temperatures the device
was not designed for. Damages caused by non-observance are not subject to warranty.
For the installation, you need 2 DWE 120V/650W PAR-36 WFL lamps.
During the operation, the lamp reaches temperatures of up to 640° C.
Procedure:
Step 1: Unscrew the lamp cover.
Step 2: If replacing the lamp, remove the old lamp from the housing and loosen the screws and wires.
Step 3: Loosen the screws on the new DWE 120V/650W PAR-36 WFL lamp with an appropriate
screwdriver.
Step 4: Connect the wires with the lamp using an appropriate screwdriver.
Step 5: Tighten the screws.
Step 6: Insert the lamp in the housing.
Step 7: Screw the lamp cover back on.
Operate the device only after installing appropriate lamps and closing the lamp cover!

Overhead rigging

Please consider the EN 60598-2-17and the respective national standards during the installation!
The installation must only be carried out by an authorized dealer!
The installation of the device has to be built and constructed in a way that it can hold 10 times the weight for
1 hour without any harming deformation.
The installation must always be secured with a secondary safety attachment, e.g. an appropriate catch net.
This secondary safety attachment must be constructed in a way that no part of the installation can fall down
if the main attachment fails.
When rigging, derigging or servicing the device staying in the area below the installation place, on bridges,
under high working places and other endangered areas is forbidden.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert before taking into operation for the first time and after changes before taking into operation another
time.
The operator has to make sure that safety-relating and machine-technical installations are approved by an
expert after every four year in the course of an acceptance test.
The operator has to make sure that safety-relating and machine-technical installations are approved by a
skilled person once a year.
Procedure:
The device should be installed outside areas where persons may walk by or be seated.
IMPORTANT! OVERHEAD RIGGING REQUIRES EXTENSIVE EXPERIENCE, including (but not limited to)
calculating working load limits, installation material being used, and periodic safety inspection of all
installation material and the device. If you lack these qualifications, do not attempt the installation yourself,
DANGER TO LIFE!
15/20
00108788.DOC, Version 2.0

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis