Herunterladen Diese Seite drucken

Märklin LINT Bedienungsanleitung Seite 17

Starter set nahverkehrszug
Vorschau ausblenden Andere Handbücher für LINT:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
9.1 Operating with 2 Trains
Two trains can be operated independently of each
other on the same layout. To do this, you must set
one train and remote controller to switch setting
G-G (1) and the second train and remote controller
to H-H (2). The switch settings for the train and
remote controller must agree with each other!
1
G - G
2
H - H
G - H
H - G
G - H
H - G
9.2 Opening the Control Car
The roof on the non-motorized control car can be
removed and fi gures or something similar can be
placed in it.
17

Werbung

loading

Diese Anleitung auch für:

29100