Herunterladen Inhalt Inhalt Diese Seite drucken

Heat Insulation - Siegenia AEROPAC Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für AEROPAC:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

AEROPAC
Installation recommendations for the PVC ventilation pipe
The gap between the PVC ventilation pipe and the core boring must be properly sealed inside the
room and outside.
Please note the following:
• Ensure that the gap to be sealed is wide enough to allow for movement in the materials.
• Insulate the gap (heat insulation)
• Seal the gap outside so that it is resistant to driving rain
• Seal the gap inside the room so that it is air-tight
• The following principle applies: "inside tighter than outside"

Heat insulation

For gaps over >6 mm, it is essential that the insulation is free of voids and suitable insulating material
is used for all wall systems.
Clean the gap. Ensure that the holding surfaces are clean and free of grease. In particular, remove
any residues of insulating material.
31
Original Operating Instruction
Insert the insulating material
Last update: 7.2.2014

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis