Herunterladen Inhalt Inhalt Diese Seite drucken

Elica Seagull Montage- Und Gebrauchsanweisung Seite 37

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation instructions
General: All of our extractor hoods are extensively tested before they leave
our facilities.
So as to make it easier to understand how the hood components fit together,
the extractor hood is supplied in separate units that comprise the hood (3),
hood base frame (1), cover plate (7) and the fan motors (11). These compo-
nents have to be installed as detailed in the following. Installing these parts
requires 2 specialists.
Make sure that there is a load bearing / suitable side
wall (fig. d) inside the base cabinet that is going to
bear the weight of the Seagull hood (~65KG).
Lift the Seagull hood out of its packaging (with two
people). Remove the housing cover (fig. C + f) from
the hood's base frame. Screw the adjustable feet 10 to
the bottom of the hood's base frame 1.
Cut out a section of the worktop to the specified
dimensions (fig. e).
Insert the hood's base frame 1 into the base cabi-
net, align and, if necessary, adjust the feet 10 (fig. G,
h, i). Make sure that the hood shaft is flush with the top
edge of the worktop (fig. j).
Screw the hood's base frame 1 to the intermediate
cabinet side wall using the new fastening holes and the
nine Spax screws (4.5x30). If necessary, check the
angle again (fig. K).
Clean the edges of the cut-out in the worktop (fig. L)
(remove oil and grease) and then remove the adhesive
foil from the magnetic strip and attach. Caution! Wide
side = front side.
Insert the cover plate 7 (fig. L+m) into the cut-out in
the worktop and fasten with two M3x9 screws.
Take the assembling aid (box) and remove the pre-
cut template. Place the assembling aid (fig. n) on top of
the worktop and insert the hood (3) into the template.
en
37

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis