Herunterladen Inhalt Inhalt Diese Seite drucken

Before Installation; Operation Modes; Informations On Air Flow - KKT KOLBE CUBE Benutzerhandbücher

Profi line
Vorschau ausblenden Andere Handbücher für CUBE:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation

11. Before installation

1 Clean the area thoroughly before installation, no dust or debris can be
!
aspirated.
2 The exhaust hose must not be routed together with gas pipes, hot-air
pipes, etc. through a chute.
3 The exhaust tube should be as straight as possible carried away from the
cover and guided at a maximum deflection of 120 ° towards the outside
and secured to the outer wall.
4 In order to avoid accumulations of fat in a corner, make sure when instal-
ling that the hood is suspended horizontally.

11.1 Operation modes

Circulating a
!
Please see installation specification in chapter 7.2.
lter mode
Install the carbon
filter (s) before
installing the
grease filters.
In additio
t the
carbo
lter(s)
A2 before moun-
ting the grease
lter (Fig. A1)
35 35

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis