Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance And Inspection - Hitachi CJ 120V Anleitung

Vorschau ausblenden Andere Handbücher für CJ 120V:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 12
English
CONNECTING WITH CLEANER
By connecting with cleaner (sold separately) through dust
collector and adopter (sold separately), most of dust can
be collected.
(1) Remove the hexagonal bar wrench from the base.
(2) Move the base fully forward. (Fig. 9, 10)
(3) Attach the chip cover with the shutter put between
the chip cover and gear cover. (Fig. 17)
(4) Connect the dust collector with adopter. (Fig. 18)
(5) Connect the adapter with the nose of cleaner. (Fig.
18)
(6) Insert dust collector into the rear hole of the base until
the hook catches in the notch. (Fig. 19)
(7) Press the hook to remove the dust collector.

MAINTENANCE AND INSPECTION

1. Inspecting the blade
Continued use of a dull or damaged blade will result
in reduced cutting efficiency and may cause
overloading of the motor. Replace the blade with a
new one as soon as excessive abrasion is noted.
Material
to be cut
Material quality
General lumber
Lumber
Plywood
Mild steel plate
Iron plate
Stainless steel plate
Aluminium copper,
brass
Nonferrous
metal
Aluminium sash
Phenol resin, melamin,
resin, etc.
Vinyl chloride,
Plastics
acryl resin, etc.
Foamed polyethylene,
foamed styrol
Card board,
corrugated paper
Pulp
Hardboard
Fiberboard
NOTE
The minimum cutting radius of No. 1 (Long), No. 21, No. 22 and No. 41 blades is 100 mm.
No. 1 (Long), No. 11, No. 12, No. 15, No. 16, No. 21, No. 22, No. 95, No. 96 and No. 97 blades are sold
separately.
9
Table 1 List of appropriate blades
Blade No. 1 No.11 No. 12, No. 15 No. 16, No. 21, No. 22 No. 95 No. 96 No. 97 123X
(Long)
42
Below 10 ∼ Below
120
60
20
5 ∼
Below
30
10
5 ∼
Below
30
10
10 ∼
3 ∼
60
30
10 ∼
3 ∼
60
30
2. Inspecting the mounting screws:
Regularly inspect all mounting screws and ensure that
they are properly tightened. Should any of the screws
be loose, retighten them immediately. Failure to do
so could result in serious hazard.
3. Maintenance of the motor
The motor unit winding is the very "heart" of the
power tool.
Exercise due care to ensure the winding does not
become damaged and/or wet with oil or water.
4. Inspecting the carbon brushes
For your continued safety and electrical shock
protection, carbon brush inspection and replacement
on this tool should ONLY be performed by a HITACHI
AUTHORIZED SERVICE CENTER.
5. Replacing supply cord
If the supply cord of Tool is damaged, the Tool must
be returned to Hitachi Authorized Service Center for
the cord to be replaced.
46
41
Thickness of material (mm)
10 ∼
5 ∼
60
40
5 ∼
3 ∼
30
20
3 ∼
Below
10
3
3 ∼
Below
12
3
Height
up to
30
5 ∼
5 ∼
Below
Below
20
6
15
5 ∼
5 ∼
3 ∼
Below
20
5
30
20
5 ∼
3 ∼
10 ∼
3 ∼
30
30
60
40
10 ∼
3 ∼
60
40
3 ∼
Below
30
6
Below
6
3 ∼
2 ∼
Below
6
3
5
1.5 ∼ 0.5 ∼ 1.5 ∼
2.5
1.5
2.5
3 ∼
Below Below
12
3
5
Height
Height Height
up to
up to up to
30
30
5 ∼
5 ∼
Below
6
20
6
15
5 ∼
5 ∼
Below
20
5
15
5 ∼
3 ∼
5 ∼
30
30
30
3 ∼
3 ∼
Below
30
6
30
10 ∼
50
5 ∼
30
3 ∼
10
3 ∼
12
30
5 ∼
20
5 ∼
30
10 ∼
50
10 ∼
50
3 ∼
30

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Cj 120va

Inhaltsverzeichnis