Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Connection - Sentiotec Concept R Black Serie Montage- Und Gebrauchsanweisung

Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Installation instructions, only for experts

4.7. Electrical connection

1. Unscrew the screws 3 and 4 with a screwdriver.
2. Unscrew the screws 1 and 5 with a screwdriver.
3. Remove the cover plate 2.
5
Connection of Concept R 9 kW and 10.5 kW
(CP-RB-090 / CP-RB-105)
1. Guide the connection cable through
the feed-through 6.
2. Connect the connectors of the connection
cable to the U – V – W – N – PE terminals
of the sauna heater and to the applicable
sauna control unit terminals. Observe the
installation instructions for the sauna control
unit when doing so.
3. Reattach the cover panel 2 to the heater.
p. 18/28
1
2
3
4
U
V
W
N
PE
6
Inhaltsverzeichnis
loading

Inhaltsverzeichnis