Installation instructions SmartVentilator SV 100
This ventilator has been developed for continuous operation to ensure the
necessary basic ventilation in buildings. Inrush airing can be activated
manually (this requires a second, switched „L1" phase) or via a humidity
sensor (a permanent „L" phase is sufficient here) as needed
Please read these instructions carefully before starting installation.
Warning:
Disconnect the power before performing any work (via the main circuit
breaker). Electrical work may only be performed by authorised personnel
and in accordance with the applicable regulations. You must ensure there is
sufficient supply air for operation of chimney-dependent fireplaces in the room
to be ventilated.
Wall/ceiling installation
1–2
Remove the panel by turning counterclockwise, loosen the 3 holding
screws and carefully open the cover with the control panel.
3
Install an air duct with internal diameter of 100 mm in the wall or
ceiling. For wall installation make sure the duct runs to the outside with
a slight gradient. For ceiling installation you must insulate the air duct if
it passes through unheated areas.
4
The power cable should be sited with a spacing of X = 65 mm from the
centre of the air duct. You will need a switched „L1" phase in addition
to the continuous „L" phase for manual activation of the „inrush airing"
function.
5–6
Feed the power cable through the provided opening (A) and screw the
unit to the wall or ceiling with four screws.
7–8
Strip the cable as shown in (B) and connect according to the circuit
diagram. The ventilator is double insulated and does not require a
protective earth conductor. If the house has an earth conductor, this
can be „parked" at the terminal (C). Secure the connected cable with
the cord grip (D).
9–10
Then reclose the cover with the control panel and screw it down.
11
Attach a safety guard to the air duct outlet on the outside.
Start-up/settings
Set the house switch for manual inrush airing to OFF (no power to „L1") and
switch the main circuit breaker back on.
12
Use the control panel to start-up and adjust the ventilator.
13
As soon as the ventilator is reconnected to the power supply, the two
buttons flash
(12.1) and
14
If you now press, for example, the button
„Inrush airing/small bathroom" is activated and flashes.

Factory settings

Room
Small bathroom
Kitchen/large bathroom
GB
(12.2) for max. 15 minutes.
(12.1), the factory setting
Basic ventilation
Inrush airing
18 m
/h
30 m
/h
3
3
30 m
/h
50 m
/h
3
3
The factory setting can be altered using button
(12.6) and, thus, adjusted to the applicable room situation.
To confirm the setting press button
indicator lamp is now permanently illuminated. The settings mode ends
automatically after 10 seconds without entry.
15
The new type of humidity sensor registers the speed at which the
humidity in the room changes. If there is a rapid change it reacts to a
rise in room humidity caused by the user and switches on the ventilator.
Press button
(12.7) to activate the humidity sensor. The LED lamp
illuminates to indicate that the sensor is active.
16
Activate the post-run timer (only with connected switched „L1" phase)
by pressing button
(12.8). The length of post-running time depends
on how long the ventilator was manually switched to the „Inrush airing"
mode.
Manual turn-on time (L1 active)
0–5 min.
5–10 min.
10–15 min.
15 + min.
An active sensor is indicated by the illumination of the LED lamp.
Pressing any button displays the current operating status. To change
the setting you need to press button
simultaneously for approx. 3 seconds. Press button
(12.6) for approx. 10 sec. to reactivate the factory setting.
17
Reattach the panel by turning clockwise.

Circuit diagram:

The voltage and frequency of the
power supply must match the ventilator's
specifications. An all-pole separation
device from the mains with a contact
gap of at least 3 mm is stipulated where
the ventilator is installed. Installation in humid rooms must be effected in
accordance with DIN/VDE 0100 T 701.
Technical data:
Protection class/type:
/ IP 24
Mains voltage:
230 V ~ 50 Hz
Power input:
1,1–4,1 W
Sound pressure:
e.g. 33 dB(A) 1 m with 30 m³/h
Capacity:
10–76 m³/h
Max. supply pressure
110 Pa
Max. supply temperature:
40 °C
Cleaning and maintenance:
Clean the panel and the housing with control panel with a damp cloth.
Do not use aggressive cleaning agents!
We reserve the right to make technical changes.
(12.5) and
and
(12.3 and 12.4), the
Post-run timer
No post-running
5 minutes
10 minutes
15 minutes
(12.5) and
(12.6)
(12.5) and
Light switch
All-pole
Ventilator
separation device
connection block

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis