Herunterladen Inhalt Inhalt Diese Seite drucken

Material Supplied - Bauknecht DTLG 9010 Benutzerhandbuch

Vorschau ausblenden Andere Handbücher für DTLG 9010:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

MATERIAL SUPPLIED

Remove all the components from the packets. Check that all the components are included. (Figure 8)
• Hood assembled with extraction unit, neon and grease filters installed
• 2 Carbon filters
• Instructions for assembly and use
• Metal box containing the electronic components.
• 2 Brackets
Screws Ø 3.5 x 9.5
• 4 Screws Ø M4 x 10
• 2 Washers
INSTALLATION - PRELIMINARY ASSEMBLY INSTRUCTIONS
The hood is designed for installation and use in "Extractor Version" with extraction to the outside or in "Filter
Version" with internal recirculation.
Install the hood away from very dirty areas, windows, doors and heat sources.
IMPORTANT: Before connecting the air outlet flexible tube, make sure the extraction unit non-return valves are
free to rotate. (Figure 9)
Extractor Version (Figure 10))
Steam and fumes are expelled to the outside through an exhaust pipe fixed to the connection flange.
The diameter of the exhaust must be equal to that of the connection collar (150 mm).
In the horizontal part, the pipe must slope slightly upwards (approx. 10°) to convey the air to the outside more
easily.
IMPORTANT: The extraction pipe is not supplied and must be purchased.
IMPORTANT: If already installed, remove the carbon filters.
GB17
Fig. 8
Fig. 9
Fig. 10

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis