Device short description
Device short description
3
3
L1
Voltage measurement connection variants
Voltage measurement connection variants
7
7
The UMG 96 RM-M is a multi-functional
The UMG 96 RM-M is a multi-functional
2
network analyser, which
network analyser, which
3
3p 4w
3p 4w
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
• measures and calculates electrical variables
• measures and calculates electrical variables
(Addr. 509 = 0, standard setting)
(Addr. 509 = 0, standard setting)
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
N
such as voltage, current, power, energy,
such as voltage, current, power, energy,
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
harmonics, etc. in building installations,
harmonics, etc. in building installations,
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
N
N
N
N
N
N
N
N
N
N
on distribution units, circuit breakers and
on distribution units, circuit breakers and
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
busbar trunking systems.
busbar trunking systems.
N
N
N
N
N
N
N
N
N
N
• displays and saves measurement results
• displays and saves measurement results
and transmits them via interfaces.
and transmits them via interfaces.
3
V
V1
V2
V1
V3
V2
V
V3
V
V1
V2
N
V1
V3
V2
V1
V
N
V3
V2
V1
V
V3
N
V2
V
V1
V3
V2
V
V1
V3
V2
N
V
V1
V3
V2
N
V
V1
N
N
N
N
V2
V
V1
V3
V2
V
V3
V
V1
V2
V1
V3
V2
V
V3
V1
V
V2
V1
V3
N
V1
N
V2
V1
N
V3
V2
V
V1
V3
V2
V
V1
V3
V2
N
V
V3
N
V
N
N
N
N
4w
Measurement with 3 phase
Measurement with 3 phase
conductors and neutral conductor.
conductors and neutral conductor.
d for
hich
1p 2w1
1p 2w1
(Addr. 509 = 4)
(Addr. 509 = 4)
phase
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L2
L2
L2
L2
L2
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L3
L3
ystem
L3
L3
L3
L2
L2
L2
L2
L2
N
N
N
N
N
N
N
N
N
N
L3
L3
L3
L3
L3
N
N
N
N
N
N
N
N
N
N
C
C
NOTE!
NOTE!
For further information on device func-
For further information on device func-
tions, data and assembly, see the user
tions, data and assembly, see the user
V1
3
V
V2
V1
V3
V2
V
V3
V
V1
V2
V1
V3
V2
V
V3
V1
V
V2
V1
N
V1
N
V2
V1
V3
N
V2
V
N
V1
V3
V2
V
N
V1
V3
V2
N
V
N
V3
N
V
N
manual.
manual.
Measured values derived from
Measured values derived from
System with equal loading of the
ws
V
V2
V1
V3
V2
V
V3
V
V1
V2
V1
V3
V2
V
V3
V1
V
V2
V1
V3
N
V1
N
V2
V1
N
V3
V2
V
V1
V3
V2
V
V1
V3
V2
N
V
V3
N
V
voltage measurement inputs V2
N
voltage measurement inputs V2
N
N
N
phases. The measured values of
and V3 are taken to be 0 and are
and V3 are taken to be 0 and are
the voltage measurement input V2
not calculated.
not calculated.
Connection variants for current measurement I1, I2, I3
Connection variants for current measurement I1, I2, I3
9
9
3p 2i
3p 2i
(Addr. 510 = 1)
(Addr. 510 = 1)
L1
L1
L1
L1
L1
With the primary or secondary device address, you
L1
L1
With the primary or secondary device address, you
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L2
obtain data regarding the M-Bus interface from the
L2
L2
obtain data regarding the M-Bus interface from the
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L3
L3
L3
L3
L3
parameter list and measured value list.
L3
L3
parameter list and measured value list.
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
N
N
N
N
N
N
N
N
N
N
N
N
N
N
C
C
NOTE!
NOTE!
For the parameter list with addresses and
For the parameter list with addresses and
setting ranges and a measured value list,
setting ranges and a measured value list,
see the device's user manual.
see the device's user manual.
2
I1
I3
I3
I2
I3
I1
I1
I2
I2
I1
I1
I1
I3
I3
I2
I2
I2
I1
I3
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
I1
I1
2
I1
I3
I3
I2
I3
I1
I2
I1
I1
I3
I2
I2
I1
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
I1
Changes to the values of the device addresses are
System with equal loading of the
Changes to the values of the device addresses are
System with equal loading of the
The measured values for current
phases. The measured values for
phases. The measured values for
not possible via the M-Bus.
not possible via the M-Bus.
current measurement input I2 are
current measurement input I2 are
measured.
measured.
The standard setting of the primary device address
The standard setting of the primary device address
2p 4w
2p 4w
is "1" (see step 17).
is "1" (see step 17).
(Addr. 510 = 5)
(Addr. 510 = 5)
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
M-Bus device features:
M-Bus device features:
L1
L1
L1
L1
L1
L1
L1
L2
L2
L2
L2
L2
L2
L2
L2
• Addressing via primary and secondary device
• Addressing via primary and secondary device
L2
L2
L2
L2
L2
L2
L3
L3
L3
L3
L3
L3
L3
L3
L2
L2
L2
L2
L2
L3
L3
L2
L2
L3
address in the range from 0 - 250.
L3
L3
address in the range from 0 - 250.
L3
L2
N
N
N
N
N
N
N
N
lt
N
N
N
• Selectable number of data points (0 - 27)
N
N
• Selectable number of data points (0 - 27)
N
• Supports protocol types:
• Supports protocol types:
-
- SND_NKE/$E5
- SND_NKE/$E5
- REQ_UD2/RSP_UD2
- REQ_UD2/RSP_UD2
2
I2
I1
I3
I3
I2
I3
I1
I1
I2
I1
I2
• Slave search: Search on M-Bus
I1
I1
I3
I2
I3
I2
I2
• Slave search: Search on M-Bus
I1
I3
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
I1
I1
I2
I1
I3
I2
I3
I1
2
I2
I1
I3
I3
I2
I3
I1
I2
I1
I1
I3
I2
I2
I1
I3
I3
I2
I3
System with equal loading of the
System with equal loading of the
Measured values derived from
phases. The measured values for
phases. The measured values for
current measurement input I3
er
current measurement input I2 are
current measurement input I2 are
are taken to be 0 and are not
calculated.
calculated.
Assembly
Assembly
Install the UMG 96 RM-M in the weatherproof front
Install the UMG 96 RM-M in the weatherproof front
panel of switch cabinets.
panel of switch cabinets.
3p 4wu
3p 4wu
3p 4u
3p 4u
L1
L1
L1
L1
L1
L1
L1
L1
L1
(Addr. 509 = 1)
(Addr. 509 = 1)
(Addr. 509 = 2)
(Addr. 509 = 2)
L2
L2
L2
L2
L2
L2
L2
L2
L2
Cut-out size:
L1
L1
L1
L1
L1
L1
L1
L1
L1
L3
L3
L3
L3
L3
L3
L3
L3
L3
92
L2
L2
L2
L2
L2
L2
L2
L2
L2
N
N
N
L3
L3
L3
L3
L3
L3
L3
L3
L3
Ensure!
N
N
N
Adequate ventilation
• install the device
V1
V2
V1
V3
V2
V
V3
V
V3
V2
V1
V
N
V3
V2
V1
V3
V
N
V2
V
V1
V3
V2
V
V1
V3
V2
N
V
V1
V3
V2
N
V
V1
V3
V2
V1
V
N
V3
V2
V1
N
N
N
N
• adhere to clearances from
V2
V
V3
V
V1
V2
V1
V3
V2
V
V3
V1
V
V2
V1
V3
V2
V
V3
V
V1
N
V2
V1
N
V3
V2
V
V1
V3
V2
V
V1
V3
V2
N
V
V3
N
V
V1
N
V2
V1
N
N
N
N
Measurement via voltage
Measurement via voltage
Measurement with 3 phase
Measurement with 3 phase
transformer with 3 phase
transformer with 3 phase
conductors without neutral
conductors without neutral
Fig. Installation situation,
conductors and a neutral
conductors and a neutral
conductor. Measured values which
conductor. Measured values which
rear view
conductor.
conductor.
require an N, use a calculated N.
require an N, use a calculated N.
conductor. Measured values which
2p 4w
2p 4w
1p 2w
1p 2w
(Addr. 509 = 3)
(Addr. 509 = 3)
(Addr. 509 = 6)
(Addr. 509 = 6)
L1
L1
m
m
L1
L1
L1
L1
L1
L1
L1
Damage to property due to
Damage to property due to
L2
L2
L2
disregard of the installation
disregard of the installation
L1
L1
L1
L1
L1
L1
L1
L1
L1
L2
L2
L3
L3
L3
L2
L2
L2
L2
instructions
instructions
CAUTION!
CAUTION!
L2
L2
L2
N
N
N
L2
L2
L2
L2
L3
L3
L3
L2
L2
Failing to observe the installation instructions can
Failing to observe the installation instructions can
N
N
N
damage or destroy your device.
damage or destroy your device.
Ensure that there is adequate air circulation in your
Ensure that there is adequate air circulation in your
installation environment; if the ambient temperatures
installation environment; if the ambient temperatures
V3
V2
V
V3
V
V1
V2
V1
V3
V2
V
V3
V1
V
V2
V1
V3
V2
V
V3
V1
N
V2
V1
V3
N
V2
V
N
V1
V3
V2
V
N
V1
V3
V2
N
V
N
V3
N
V
N
V1
N
V2
V1
are high, ensure there is adequate cooling if required.
are high, ensure there is adequate cooling if required.
System with equal loading of the
TN-C system with 1-phase, three-
TN-C system with 1-phase, three-
V2
V
V3
V
V1
V2
V1
V3
V2
V
V3
V1
V
V2
V1
V3
V2
V
V3
V
V1
N
V2
V1
N
V3
V2
V
V1
V3
V2
V
V1
V3
V2
N
V
V3
N
V
V1
N
V2
V1
phases. The measured values of
N
N
conductor connection. Measured
conductor connection. Measured
N
N
the voltage measurement input V2
values derived from voltage
values derived from voltage
for the phases that are not created
are calculated.
are calculated.
measurement input V3 are taken to
measurement input V3 are taken to
be 0 and are not calculated.
be 0 and are not calculated.
3p 2i0
3p 2i0
3p 3w3
3p 3w3
(Addr. 510 = 2)
(Addr. 510 = 2)
(Addr. 510 = 3)
(Addr. 510 = 3)
Number of data points (addr. 080)
Number of data points (addr. 080)
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L2
L2
L2
L2
Each data point is assigned to a certain measured
Each data point is assigned to a certain measured
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L3
L3
L3
L3
L3
L3
value (see "List of the data points"). In order
L3
L3
value (see "List of the data points"). In order
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
to determine the number of data points for the
to determine the number of data points for the
telegram RSP_UD2, configure address 080:
telegram RSP_UD2, configure address 080:
Address:
Address:
080
Meaning:
Meaning:
Number of data points
I2
I2
I1
I1
I1
I3
I2
I3
I2
I2
I1
I3
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
I1
I1
I2
I2
I1
I1
I1
I3
I3
I2
I2
I2
I1
I3
I1
I3
I3
I2
Setting range:
Setting range:
0 to 27
I2
I1
I1
I3
I2
I2
I1
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
I1
I2
I1
I1
I3
I2
I2
I1
I1
I3
I3
I2
Default setting:
Default setting:
0 (= all data points)
The measured values for current
Measurement in the 3-phase
Measurement in the 3-phase
measurement input I2 are
measurement input I2 are
network with unequal loading.
network with unequal loading.
calculated.
calculated.
Example: Read out data points 1 to 6
Example: Read out data points 1 to 6
• Choose setting 6 for the address 080.
• Choose setting 6 for the address 080.
• With each request the device transmits all data
• With each request the device transmits all data
1p 2i
1p 2i
1p 2w
1p 2w
points up to and including data point 6.
points up to and including data point 6.
(Addr. 510 = 6)
(Addr. 510 = 6)
(Addr. 510 = 7)
(Addr. 510 = 7)
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
L1
Example: Read data point 10
Example: Read data point 10
L2
L2
L2
• Choose setting 10 for the address 080.
• Choose setting 10 for the address 080.
L2
L2
L2
N
N
N
N
N
N
N
N
• With each request the device transmits all data
• With each request the device transmits all data
N
N
N
N
N
N
points up to and including data point 10.
points up to and including data point 10.
• Do not neglect the required data points.
• Do not neglect the required data points.
I1
I2
I2
I1
I1
I1
I3
I2
I3
I2
I2
I1
I3
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
I1
I1
I2
I1
I2
I1
I1
I3
I2
I3
I2
I2
I1
I3
I1
I3
I3
I2
I2
I1
I3
I2
I3
I1
I2
I1
I3
I2
I3
I1
I2
I1
I1
I3
I2
I2
I1
I3
I3
I2
I3
I1
I2
I1
I1
I3
I2
Measured values derived from
Measured values derived from
Measured values derived from
current measurement input I3
current measurement inputs I2 and
current measurement inputs I2 and
are taken to be 0 and are not
I3 are taken to be 0 and are not
I3 are taken to be 0 and are not
for the phases that are not created
calculated.
calculated.
calculated.
calculated.
Connecting the supply voltage
4
4
Current measurement I1, I2, I3
8
8
The supply voltage level for your device is
specified on the rating plate.
The UMG 96 RM-M
3p 2u
3p 2u
L1
L1
L1
L1
L1
L1
L1
L1
L1
After connecting the supply voltage, an indication
• enables current measurements via current
(Addr. 509 = 5)
(Addr. 509 = 5)
L2
L2
L2
L2
L2
L2
L2
L2
L2
Cut-out size:
is shown on the display. If no indication appears,
L1
L1
L1
L1
L1
L1
L1
L1
L1
L3
L3
L3
L3
L3
L3
L3
L3
L3
+0.8
x 92
92
+0.8
+0.8
x 92
mm
+0.8
mm
check whether the supply voltage is within the
L2
L2
L2
L2
• enables the connection of current transformers
L2
L2
L2
L2
L2
rated voltage range.
L3
L3
L3
L3
L3
L3
L3
L3
L3
Ensure!
• has the current transformer ratio 5/5 A set as
L
Adequate ventilation
N
• install the device
• measures AC currents, does not measure DC
vertically!
vertically!
V1
V2
V1
V3
V2
V
V3
V
V
V3
N
V2
V
V3
V1
V2
V
V1
V3
V2
N
V
V1
V3
V2
N
V
V1
V3
V2
V1
V
N
V3
V2
V1
V
V3
N
V2
V
V1
V3
N
N
N
N
N
• adhere to clearances from
V1
V2
V1
V3
V2
V
V3
V1
V
V2
V1
V3
V2
V
V3
V
neighbouring components!
N
V3
V2
V
V1
neighbouring components!
V3
V2
V
V1
V3
V2
N
V
V3
N
V
V1
N
V2
V1
N
V3
V2
V
V1
V3
N
N
N
N
N
Measurement via voltage
Measurement via voltage
transformer with 3 phase
transformer with 3 phase
Fig. Installation situation,
conductors without neutral
conductors without neutral
rear view
conductor. Measured values which
require an N, use a calculated N.
require an N, use a calculated N.
WARNING!
Fig. Connecting supply voltage.
3p 1w
3p 1w
Serious bodily injury or death can result from:
(Addr. 509 = 7)
(Addr. 509 = 7)
L1
L1
L1
L1
L1
L1
L1
L1
L1
L2
L2
L2
L2
L2
L2
L2
L3
L3
L3
L3
L3
L3
L3
L1
L1
L1
L1
L1
L1
L1
L1
L1
L2
L2
L1
L1
L1
L1
L1
L1
L1
WARNING!
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L3
L3
L3
L3
L3
L3
L3
Serious bodily injury or death can result from:
L3
L3
L2
L2
L3
L3
L3
L3
L3
L1
L1
L1
L1
L1
L1
L1
De-energise your device before starting
L1
L1
L1
L1
L2
L2
L2
L2
L1
L1
L1
• Contact with bare or stripped live wires.
L2
L2
L2
work! Check that it is de-energised.
L2
L2
L3
L3
L3
L2
L3
L2
L2
L2
L2
L3
L3
L3
L1
L1
L1
L1
• Device inputs that are dangerous to touch.
L3
L3
L3
L3
L3
L3
L3
L1
L1
L1
L1
Earth your system! Use the earth connection
L1
L1
L1
N
L2
N
L2
L2
L2
De-energise your device before starting
N
N
N
N
N
L2
L2
L2
L2
L2
L2
L2
points with earthing symbols for this!
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
L3
work! Check that it is de-energised.
V
V3
N
V2
V1
V
N
V3
V1
V2
V2
V1
V
N
V1
V3
V2
V3
V2
V
N
V3
V
V1
N
V3
V
V2
N
V
V1
N
V3
V2
V
V3
V
V1
N
V2
V1
V3
N
V2
V
N
V1
V3
Earth the secondary windings of current
N
N
N
N
N
N
N
N
N
N
N
3 systems with equal loading of
3 systems with equal loading of
transformers and all of the metal parts of the
N
V3
V2
V1
V
V1
V3
V2
V1
V2
V
V3
V1
V2
V3
V2
V
V3
V1
V
V3
V
V2
V1
V
V3
V2
V
V3
V
the phases. The measured values
the phases. The measured values
N
N
N
N
N
N
V1
N
V2
V1
N
V3
V2
V
V1
N
V3
transformer that could be touched!
for the phases that are not created
(L2/L3, L1/L3, L1/L2) for the
(L2/L3, L1/L3, L1/L2) for the
relevant systems are calculated.
relevant systems are calculated.
I1
I2
I1
I3
I2
I3
I1
I2
I1
I3
Bus structure/topology
10
10
List of the data points
• Connect M-Bus devices in star (1),
3p 3w
3p 3w
(Addr. 510 = 4)
(Addr. 510 = 4)
• Each M-Bus device has its own address
L1
L1
L1
L1
L2
L2
L2
L2
L3
L3
L3
L3
• Divide (expand) bus structures into individual
N
N
N
N
• Up to 250 subscribers can be connected
080
Number of data points
I2
I1
I3
I3
I2
I3
• The bus structures ensure that the system
0 to 27
I2
I1
I3
I3
I2
I3
I1
I2
I1
I3
I2
I3
I1
I2
I1
0 (= all data points)
Measurement in the 3-phase
Measurement in the 3-phase
network with equal loading.
network with equal loading.
The measured values for current
The measured values for current
• The bus structure is out of operation during
measurement inputs I2 and I3 are
measurement inputs I2 and I3 are
calculated.
calculated.
3p 1w
3p 1w
(Addr. 510 = 8)
(Addr. 510 = 8)
L1
L1
L1
L1
L1
L1
L1
L1
1. Star structure
L1
L1
L2
L2
L2
L2
L2
L1
L2
L1
L2
L1
L2
L1
L3
L2
L3
L3
L2
L3
L3
L2
L3
L2
L3
L2
L3
L2
L3
L3
L3
L3
L3
L3
L1
L1
L1
L1
L1
L1
L1
L1
L2
L1
L2
L2
L1
L2
L2
L1
L2
L1
L1
L2
L1
L2
L3
L2
L3
L3
L2
L3
L3
L2
L3
L2
L2
L3
L3
L2
L3
L3
L3
L3
L3
L3
L1
L1
L1
L1
L1
L1
L1
L1
L2
L1
L2
L2
L1
L2
L2
L1
L2
L1
L1
L2
L2
L1
L3
L2
L3
L3
L2
L3
L3
L2
L3
L2
L3
L2
L3
L2
L3
L3
L3
L3
L3
L3
I2
I1
I3
I3
I2
I1
I1
I3
I2
I2
I1
I1
I1
I3
I2
I3
I2
I2
I1
I3
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
I1
I2
I1
I3
I2
I3
I2
I1
I3
I3
I2
I3
I1
I2
I1
I1
I3
I2
I2
I1
I3
I3
I2
I3
3 systems with equal loading of
3 systems with equal loading of
Each M-Bus device is linked to the M-Bus
the phases. The measured values
the phases. The measured values
Master. By switching individual devices on and
for the phases that are not created
(L2/L3, L1/L3, L1/L2) for the
(L2/L3, L1/L3, L1/L2) for the
off, it is easier to locate the fault.
relevant systems are calculated.
relevant systems are calculated.
11 / 16
11 / 16
Connecting the supply voltage
Current measurement I1, I2, I3
The supply voltage level for your device is
specified on the rating plate.
The UMG 96 RM-M
L1
After connecting the supply voltage, an indication
• enables current measurements via current
L2
is shown on the display. If no indication appears,
L1
transformer only.
transformer only.
L3
check whether the supply voltage is within the
• enables the connection of current transformers
L2
rated voltage range.
with secondary currents of ../1 A and ../5 A.
with secondary currents of ../1 A and ../5 A.
L3
• has the current transformer ratio 5/5 A set as
L
N
standard.
standard.
Fuse
Fuse
• measures AC currents, does not measure DC
currents!
currents!
Circuit breaker
Circuit breaker
V2
V
V1
V3
V2
V
V3
V
N
N
N
V2
V
V1
V3
V2
V
V3
V
N
N
N
c
c
Risk of injury due
Risk of injury due
to electric voltage!
to electric voltage!
WARNING!
Fig. Connecting supply voltage.
Serious bodily injury or death can result from:
c
c
• Contact with bare or stripped live wires.
• Contact with bare or stripped live wires.
L1
Risk of injury due
Risk of injury due
L2
• Current measurement inputs that are
• Current measurement inputs that are
L3
to electric voltage!
to electric voltage!
L1
dangerous to touch on the device and on the
dangerous to touch on the device and on the
L1
WARNING!
L2
L2
current transformers.
current transformers.
L3
Serious bodily injury or death can result from:
L3
L1
De-energise your device before starting
L1
• Contact with bare or stripped live wires.
L2
work! Check that it is de-energised.
L2
L3
• Device inputs that are dangerous to touch.
L1
L1
L3
Earth your system! Use the earth connection
L1
De-energise your device before starting
L2
L2
N
L2
points with earthing symbols for this!
L3
L3
L3
work! Check that it is de-energised.
V2
V
N
V1
Earth the secondary windings of current
V3
V2
V
N
V3
V
N
N
transformers and all of the metal parts of the
V2
V
V1
N
V3
V2
V
N
V3
V
N
transformer that could be touched!
I2
I3
I1
I2
I1
I3
I2
I3
Bus structure/topology
List of the data points
• Connect M-Bus devices in star (1),
line (2) or tree structures (3).
line (2) or tree structures (3).
Data points
Data points
Description
Description
• Each M-Bus device has its own address
L1
L1
1
1
Active energy, without backstop
Active energy, without backstop
within the bus structure.
within the bus structure.
2
2
Active energy, applied
Active energy, applied
• Divide (expand) bus structures into individual
L2
L2
3
3
Active energy, supplied
Active energy, supplied
bus segments with repeaters (line amplifiers).
bus segments with repeaters (line amplifiers).
4
4
Reactive energy, inductive
Reactive energy, inductive
• Up to 250 subscribers can be connected
5
5
Reactive energy, capacitive
Reactive energy, capacitive
together in a single bus segment (depending
together in a single bus segment (depending
6
6
Reactive energy, without backstop
Reactive energy, without backstop
on the M-Bus master).
on the M-Bus master).
7
7
Apparent energy
Apparent energy
• The bus structures ensure that the system
I3
I2
8
I3
8
Running time, comparator 1a
Running time, comparator 1a
I1
I2
I1
I3
I2
I3
remains stable when M-Bus devices are
remains stable when M-Bus devices are
9
9
Running time, comparator 1b
Running time, comparator 1b
exchanged.
exchanged.
10
10
Running time, comparator 1c
Running time, comparator 1c
• The bus structure is out of operation during
11
11
Running time, comparator 2a
Running time, comparator 2a
a replacement of the M-Bus master.
a replacement of the M-Bus master.
12
12
Running time, comparator 2b
Running time, comparator 2b
13
13
Running time, comparator 2c
Running time, comparator 2c
14
14
Operating hours counter
Operating hours counter
1. Star structure
15
15
I_total
I_total
16
16
P_total
P_total
Slave
Slave
17
17
Q_total, fundamental oscillation
(Measurement
Q_total, fundamental oscillation
(Measurement
device)
device)
18
18
S_total
S_total
Slave
Slave
Slave
Slave
19
19
Uln - Phase L1
Uln - Phase L1
Master
Master
(Measurement
(Measurement
(Measurement
(Measurement
(Central unit)
(Central unit)
device)
20
device)
20
Uln - Phase L2
Uln - Phase L2
device)
device)
21
21
Uln - Phase L3
Uln - Phase L3
Slave
Slave
(Measurement
(Measurement
22
22
I - Phase L1
I - Phase L1
device)
device)
23
23
I - Phase L2
I - Phase L2
Each M-Bus device is linked to the M-Bus
24
24
I - Phase L3
I - Phase L3
Master. By switching individual devices on and
25
25
P - Phase L1
P - Phase L1
off, it is easier to locate the fault.
26
26
P - Phase L2
P - Phase L2
27
27
P - Phase L3
P - Phase L3
Damage to property due to
Damage to property due to
m
m
Connection variant 3p 4w current measurement
Connection variant 3p 4w current measurement
disregard of the connection
disregard of the connection
(I1, I2, I3) via current transformer (Addr. 510 = 0,
(I1, I2, I3) via current transformer (Addr. 510 = 0,
conditions or impermissible
conditions or impermissible
L1
L1
L1
L1
L1
L1
L1
standard setting).
standard setting).
CAUTION!
CAUTION!
L1
L1
L1
L1
L1
voltage swells
voltage swells
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L2
L3
L3
L3
L3
L3
L3
L3
Your device can be damaged or destroyed
Your device can be damaged or destroyed
L3
L3
L3
L3
L3
N
N
N
N
N
N
N
by a failure to comply with the connection
by a failure to comply with the connection
N
N
N
N
N
conditions or by exceeding the permissible
conditions or by exceeding the permissible
voltage range.
voltage range.
Before connecting the device to the supply
Before connecting the device to the supply
voltage, please check:
voltage, please check:
I1
I1
I2
I1
I2
I1
I1
I3
I3
I2
I2
I2
I1
I3
I1
Load
Load
I1
I2
I1
I1
I3
L1
I2
I2
I1
I1
• Voltage and frequency correspond to the
• Voltage and frequency correspond to the
details on the ratings plate! Threshold
details on the ratings plate! Threshold
L2
values stipulated in the user manual have
values stipulated in the user manual have
L3
been complied with!
been complied with!
N
• In building installations, the supply
• In building installations, the supply
c
c
voltage must be protected with a UL/IEC
voltage must be protected with a UL/IEC
Risk of injury due to
Risk of injury due to
approved circuit breaker / a fuse!
approved circuit breaker / a fuse!
large currents and high
large currents and high
L1
L1
L1
L1
L1
L1
L1
• The circuit breaker
• The circuit breaker
electric voltages!
electric voltages!
L1
L1
L1
L1
L1
WARNING!
WARNING!
L2
L2
L2
L2
L2
L2
L2
- must be easily accessible for the user
- must be easily accessible for the user
L2
L2
L2
L2
L2
Current transformers operating with an open
Current transformers operating with an open
L3
L3
L3
L3
L3
L3
L3
and be installed close to the device.
and be installed close to the device.
L3
L3
L3
L3
L3
N
N
N
N
N
N
N
secondary circuit (high voltage peaks) can result
secondary circuit (high voltage peaks) can result
- must be labelled for the relevant device.
- must be labelled for the relevant device.
N
N
N
N
N
in serious or even fatal injuries.
in serious or even fatal injuries.
• Do not connect the supply voltage to the
• Do not connect the supply voltage to the
Avoid open operation of the current transformers -
Avoid open operation of the current transformers -
L1
L1
voltage transformers.
voltage transformers.
short-circuit unloaded transformers!
short-circuit unloaded transformers!
L2
L2
• Provide a fuse for the neutral conductor
• Provide a fuse for the neutral conductor
L3
L3
if the source's neutral conductor
if the source's neutral conductor
I1
I1
I2
I1
I2
I1
I1
I3
I2
I3
I2
I2
I1
C
C
NOTE!
NOTE!
I1
I2
I1
I3
I2
I1
I2
I1
connection is not earthed.
connection is not earthed.
Information on current data and current
Information on current data and current
transformer data can be found in the user
transformer data can be found in the user
manual.
manual.
I1
I2
I1
I3
I2
I3
2. Line structure
2. Line structure
Master
Master
Unit
Unit
Resolution
Resolution
Device
Device
Format Byte
Format Byte
L1
L1
L1
L1
(Central unit)
(Central unit)
L2
L2
Wh
Wh
10
10
0
0
6
6
L3
L3
Wh
Wh
10
10
0
0
6
6
Slave
Slave
Slave
Slave
Slave
Slave
L1
L1
Repeater
Repeater
(Measurement
(Measurement
(Measurement
(Measurement
(Measurement
(Measurement
N
Wh
N
Wh
10
10
0
L2
0
L2
6
6
device)
device)
device)
device)
device)
device)
L3
L3
varh
varh
10
10
1
1
6
6
L1
L1
Slave
Slave
Slave
Slave
Slave
Slave
varh
varh
10
10
1
1
6
6
L2
L2
(Measurement
(Measurement
(Measurement
(Measurement
(Measurement
(Measurement
L3
L3
device)
device)
device)
device)
device)
device)
varh
varh
10
10
1
1
6
6
The M-Bus devices are connected (in series)
VAh
The M-Bus devices are connected (in series)
VAh
10
10
2
2
6
6
sec
I1
sec
I2
I1
I3
1
I2
I3
1
1
I1
1
I2
I1
4
I3
I2
4
I3
with the M-Bus Master:
with the M-Bus Master:
• Economical bus structure.
sec
• Economical bus structure.
sec
1
1
2
2
4
4
sec
sec
1
1
3
3
4
4
• Observe possible faults due to a voltage
• Observe possible faults due to a voltage
sec
sec
1
1
4
4
4
4
drop in the bus structure!
drop in the bus structure!
sec
sec
1
1
5
5
4
4
• Faults are difficult to locate.
• Faults are difficult to locate.
sec
sec
1
1
6
6
4
4
sec
sec
1
1
0
0
4
4
3. Tree structure
3. Tree structure
mA
mA
1
1
4
4
4
4
Slave
Slave
Slave
Slave
W
W
1
1
5
(Measurement
5
(Measurement
4
4
(Measurement
(Measurement
device)
device)
device)
device)
var
var
1
1
6
6
4
4
VA
Slave
VA
Slave
1
1
7
Slave
7
Slave
4
4
Master
Master
(Measurement
(Measurement
(Measurement
(Measurement
(Central unit)
(Central unit)
mV
mV
100
100
1
1
4
4
device)
device)
device)
device)
mV
mV
100
100
2
2
4
4
Slave
Slave
Slave
Slave
mV
(Measurement
mV
(Measurement
100
100
3
(Measurement
3
(Measurement
4
4
device)
device)
device)
device)
mA
mA
1
1
1
1
4
4
The tree structure combines the star and line structure:
The tree structure combines the star and line structure:
mA
mA
1
1
2
2
4
4
• Repeaters divide the bus segments.
• Repeaters divide the bus segments.
mA
mA
1
1
3
3
4
4
• Simple to locate a fault because only individual bus
• Simple to locate a fault because only individual bus
W
W
1
1
1
1
4
4
segments are usually affected in the event of a fault.
segments are usually affected in the event of a fault.
W
W
1
1
2
2
4
4
W
W
1
1
3
3
4
4
9
L1
L1
L1
L
L1
L1
L2
L2
L2
L
L2
L2
L3
L3
L3
L
L3
L3
N
N
N
N
N
N
I3
I3
I2
I2
I1
I3
I3
I2
I3
I1
I1
I3
I3
L1
I2
I2
I1
I3
I3
I2
I3
I1
L2
L3
N
L1
L1
L1
L
L1
L1
L2
L2
L2
L
L2
L2
L3
L3
L3
L
L3
L3
N
N
N
N
N
N
I3
I1
I3
I3
I2
I2
I1
I3
I3
I2
I3
I1
I1
I3
I1
I1
I3
I2
I2
I1
I3
I3
I2
I3