Herunterladen Diese Seite drucken

Installation, Assembly Information; Requirements For The Installation Site - Cgs Instruments Sam-1000_Dp2 Bedienungsanleitung

Verfügbare Sprachen

Verfügbare Sprachen

4 Installation, assembly information

Safety measures:
Installation and assembly must only be performed by specially trained and qualifi ed personnel . The
E
general accident prevention regulations must thereby be observed .
A formal handover to the operator occurs in case of implementation by CGS or its authorised representatives .
The device can subsequently be properly operated according to the operating instructions and applicable
safety regulations .
Before opening the device, disconnect it from the power supply in any case .

Requirements for the installation site:

• No exposure to direct sunlight
• Low exposure to dust
• Suffi cient space for operation and maintenance
• Available and easily accessible escape routes
• No tripping hazards caused by cables that run close to the ground, etc .
• Maximum height: 2000 m above sea level
Technical prerequisites (supply voltage, gas pressures, etc . ) can be found in the Technical Data section .
Product:
SAM-1000_DP2
Revision 1 . 1 – Issue June 2016
58/94
loading