Herunterladen Inhalt Inhalt Diese Seite drucken

Operation Instructions And Assembly Of The Ionizer; Assembly; Anleitung; To Stop The Process, Please Press "Ion" A Second Time - Masily Ruka Montage- Und Gebrauchsanleitung

Inhaltsverzeichnis

Operation instructions and assembly of the ionizer

Assembly

The ionizer is attached to the inside of your cabin wall with 2 Phillips screws.

Anleitung

1 . Please press the arrow "ion" to start the ionizer. The green lamp lights up.
2. Please press the arrow "O3" to start the ozone cleaning system. The red lamp lights up.

To stop the process, please press "ion" a second time

Change the fragrance plate

The fragrance plate is inserted on the back of the ionizer.
To do this, you have to unscrew the cover, insert the fragrance plate and then reinsert and tighten the
cover.

Benefits of the ionizer

Active oxygen
sterilization
Improves lung function
Inhaltsverzeichnis
loading

Inhaltsverzeichnis