Herunterladen Diese Seite drucken

Electrical Installation - Siemens RLM162 Installationsanleitung

Luftkanaltemperaturregler
Vorschau ausblenden Andere Handbücher für RLM162:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

en
English
Mounting
Place of installation
• As an extract air temperature controller:
In the extract air duct directly after the air intake from the
room, or in the common duct in the case of several air
intakes. Always upstream of the extract air fan
• As a supply air temperature controller:
In the supply air duct downstream from the supply air
fan if fan is installed after the last air handling unit,
otherwise
In the supply air duct downstream from the last air
handling unit in a distance of 0.5 m
• As a minimum supply air temperature limiter:
In the supply air duct as close as possible to the air dis-
charge into the room
• As a dewpoint controller:
Immediately downstream from the droplet separator of
the air washer
Mounting
Procedure:
1.
First mount the flange. For drilling holes, refer to "Di-
mensions".
2.
Bend flexible sensing element manually (never use a
tool) so that – when mounted – it stretches diagonally
across the air duct .
Note! The flexible sensing element may not touch the
duct wall: The minimum clearance is 50 mm and the
smallest permissible bending radius 10 mm
3.
Fit mounting flange.
4.
Slide controller on mounting flange and snap it on.

Electrical installation

• Ensure that the local regulations for electrical installa-
tions are complied with
• The connecting terminals are located under the flexible
plastic cover
• Make wiring according to the plant documentation. If not
available, use the connection diagrams contained in
these Installation Instructions
• Observe the permissible cable lengths
• Switch on power only when commissioning the controller
Siemens Building Technologies / HVAC Products
Settings
2
3
1
1
LED for test mode / normal operation
2
DIP switch block
3
Setting slider for setpoint increase or decrease
4
Potentiometer for P-band
5
Temperature setting slider for setpoint or limit value
Operating action:
Where?
What?
DIP switch block,
1
2
switches no. 1 and 2
Control mode and integral action time:
DIP switch block,
3
4
switches no. 3 and 4
Test mode:
DIP switch block,
5
switch no. 5
Outside temperature compensation:
DIP switch block,
6
switch no. 6
P-band Y1 (not adjustable for Y2):
Potentiometer 4
Potentiometer setting should correspond to the required
range of the controller's output signal
Setpoint increase / decrease:
Slider 3
Setpoint or limit value (supply or extract air temp.):
Temperature setting
Adjust after commissioning
slider 5
Indication of operating state
The red LED indicates the controller's operating state:
• LED lit: Mains voltage present
• LED flashes: In test mode
The LED is also visible when the cover is fitted.
CE1G3332hu
4
Heating and cooling in sequence
Two-stage heating
Single-stage cooling
Single-stage heating
P-mode
PI mode, integral action time = 600 s
(SLOW)
PI mode, integral action time = 120 s (FAST)
PI mode, integral action time = 180 s
(MEDIUM)
Test mode
Normal operation
HIGH
LOW
06.09.2002
5
3/8

Werbung

loading