5. Installation
5.4
Fuel Cell Installation
(1) Connect the off-heat flange to the EFOY Pro with the
4 screws.
(2) Place the unit onto the mounting plate. The interface
has to be on the front side in the direction of the air
openings.
(3) Connect the battery charging cable to the EFOY Pro.
(4) Connect the remote control connection cable to the
EFOY Pro (socket "Remote Control").
(5) Attach the exhaust hose to the port at the EFOY Pro.
20