Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Connection - Sentiotec Rb 2,5 Kw Montage- Und Gebrauchsanweisungen

Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 28
Installation instructions, only for experts

4.6. Electrical connection

1. Unscrew the screws 2 and 3 with a screwdriver.
2. Remove the cover plate 1.
3. Guide the connection cable for the evaporator through the feed-through 5.
4. Connect the connectors of this connection cable to the PE – N – U1 – Wm
terminals, to the connector block 4 and to the applicable sauna control unit
terminals. Observe the installation instructions for the sauna control unit
when doing so.
5. Reattach the cover panel 1 to the auxiliary evaporator R.
Fig.10
Removing the cover panel
3
p. 16/26
1
2
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

1-027-762Cp-25-stp-b

Inhaltsverzeichnis