MONTAGEANWEISUNGEN • CONSTRUCTION INSTRUCTIONS
5.1 • LAGUNE
BASIC CONSTRUCTION: CONSTRUCTION SITUATION 1
®
Step 1: assembly of wall section
➀
1 • Draw a line
(laser, chalk line) for the positioning of the wall section
2 • Mark the drill holes Ø 6 mm
3 • Drill holes, insert plugs .
A
4 • Provide the rear of the wall section with expansion tape
5 • Assemble wall section with screws and washers (cross-headed screwdriver).
Tap the wall section level if the wall is not flat.
➄
in the upper groove between wall and wall section (DETAIL C).
6 • Spray silicone
7 • If the motor cables are to be brought through the rear wall it is recommended to prepare this now.
This can be done along the wall section to the left and right on the wall section
DETAIL A
➃
➀
A
➁
DETAIL A
17,5 mm Abstand zwischen Seitenkante Wandprofil und Seitenkante Lagune
17.5 mm distance from wall section side to Lagune
DETAIL B
Im Abstand von 75 mm von Seitenkante Lagune® erstes Bohrloch Ø 6 mm
75 mm from Lagune side first drill hole Ø 6 mm
NULPAS
LIGNE DE ZERO
.
w w w
r e n s o n
➂
on the line for fixing the wall section
➃
(DETAILS A and C)
C
B
B
C
®
side
Lagune
®
breedte
Lagune
largeur
®
.
e u
Lagune
S U N P R OT E C T IO N -S C R E E N S
➁
height (Lagune
H total - 114mm) in relation to ZERO LEVEL.
®
➁
. First drill hole at 75 mm from the Lagune
➅
(DETAIL B).
➀
®
A
17.5
A
11
TPD-LAG-06MI-010-20100915-DE EN
®
side.
®
DETAIL B
17.5
6
➂
sleuf van 40mm
Schlitz von 40 mm
slot 40mm
sleuf van 40mm
75
➁
DETAIL B
➄
➃
DETAIL C
DETAIL C
A-A