When transporting this machine from a long distance, it cannot be pulled on the road. It needs to
be placed on the truck and transported after being tied in the place marked with binding points.
5. Installation of machines
1) Remove processor and all parts from the steel shipping crate.
2) Insert axle through the processor ensuring it is centered and tighten the bolts to hold it
securely in place. Note, it is important to ensure the two holes are facing up as they are used
to hold the wheel fenders in place.
3) Place a liberal amount of grease on the inside of the wheel hubs and in the bearings. Insert
greased bearing, washer and nut over axle spindle and tighten the nut. The cotter pin can be
inserted into the hole in the end of the axle. Finally, the dust cap can be installed. See below
images.