Herunterladen Diese Seite drucken

VEVOR PYRAMID SQUARE Bedienungsanleitung Seite 23

Gasbetriebene infrarot-aussenkammer terrassenheizungen

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 65
OPERATION INSTRUCTIONS
Leak Check
1. Make 2-3 oz. of leak check solution (one part liquid dishwashing
detergent and three parts water).
2. Apply several drops of solution where hose attaches to regulator.
3. Apply several drops of solution where regulator connects to cylinder.
4. Apply several drops of solution where hose attaches to the control box
assy.
5. Make sure all patio heater and light valves are OFF.
6. Turn cylinder valve ON.
- 22 -

Werbung

loading

Verwandte Produkte für VEVOR PYRAMID SQUARE