WARNING! All wiring must be performed by a qualified
personnel.
WARNING! It's very important for system safety and
efficient operation to use appropriate cable for battery
connection. To reduce risk of injury, please use the
proper recommended cable 、stripping length(L2) and
tinning length(L1) as below.
Recommended battery cable 、 stripping length (L2) and tinning
length(L1):
Please follow below steps to implement battery connection:
1.
Remove insulation sleeve 18 mm for positive and negative cables
based on recommended stripping length.
2.
Connect all battery packs as units requires. It's suggested to use
recommended battery capacity.
3.
Insert battery cable flatly into battery connector of inverter and make
sure the bolts are tightened with torque of 2-3 Nm. Make sure polarity at
both the battery and the inverter/charge is correctly connected and battery
cables are tightly screwed to the battery connector.
- 7 -