1. Unpacking and Inspection
Before installation, please inspect the unit. Be sure that nothing inside
the package is damaged. You should have received the following items
inside of package:
2. Preparation
Before connecting all wirings, please take off bottom cover by removing
two screws as shown below.
3. Mounting the Unit
Consider the following points before selecting where to install:
Do not mount the inverter on flammable construction materials.
Mount on a solid surface
Install this inverter at eye level in order to allow the LCD display to be
read at all times.
The ambient temperature should be between 0°C and 55°C to ensure
optimal operation.
The recommended installation position is to be adhered to the wall
vertically.
Be sure to keep other objects and surfaces as shown inthe right
diagram to guarantee sufficient heat dissipation and to have enough
space for removing wires.
INSTALLATION
The unit x 1
User manual x 1
- 5 -