Herunterladen Inhalt Inhalt Diese Seite drucken

Commissioning; Initial Start-Up; Appliance Handover; Specification - STIEBEL ELTRON FET Bedienung Und Installation

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
INSTALLATION | guARANTEE | ENVIRONMENT ANd RECYCLINg

Commissioning

11. Commissioning

11.1 Initial start-up

Once the device has been wired to the heat pump manager,
the commissioning wizard starts up.
f Select the heating circuit for which the device is responsi-
f
ble. You can also assign the heating circuit from the heat
pump manager (SETTINgS / HEATINg / REMOTE CON-
TROL / HEATINg CIRC PRESELECTION).

11.2 Appliance handover

f Explain the appliance function to users and familiarise
f
them with its operation.
Note
Hand over these operating and installation instruc-
tions to the user for safe-keeping. All information in
these instructions must be closely observed. The in-
structions provide information on safety, operation,
installation and maintenance of the appliance.

12. Specification

12.1 Data table

Height
Width
depth

Guarantee

The guarantee conditions of our German companies do not
apply to appliances acquired outside of Germany. In countries
where our subsidiaries sell our products a guarantee can only
be issued by those subsidiaries. Such guarantee is only grant-
ed if the subsidiary has issued its own terms of guarantee. No
other guarantee will be granted.
We shall not provide any guarantee for appliances acquired in
countries where we have no subsidiary to sell our products.
This will not affect warranties issued by any importers.

Environment and recycling

We would ask you to help protect the environment. After use,
dispose of the various materials in accordance with national
regulations.
FET
FET
234723
mm
96
mm
145
mm
31
| 21

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

234723

Inhaltsverzeichnis