Herunterladen Inhalt Inhalt Diese Seite drucken

Initiation / Operating Control; General; Venting; Operating Control - Biral AX 10 Montage- Und Betriebsanleitung

Vorschau ausblenden Andere Handbücher für AX 10:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

60
english
|

7. Initiation / operating control

7.1 General

Flush system thoroughly without pump. See section 4. Fill and de-aerate the system properly.
Only put the pump into operation when the system is full. Switch on the distribution voltage.

7.2 Venting

Venting of the pump, particularly of the motor space, is performed automatically after a brief pe-
riod of operation. Running dry briefly (max. 2 mins.) does not harm the motor. It is recommended
to run the pump briefly on «max» to ensure rapid venting of the system.
The pump must not be operated without water!
Warning
There is a danger of scalding.

7.3 Operating control

One LED must always be lit and the present power consumption must be displayed.
(See section 6.1 item 6)

7.4 Deblocking

Not necessary. Motor starts with high torque.

8. Maintenance, servicing

Warning
Before performing maintenance on the pump,
make sure that the pump is taken out of operation,
disconnect all poles from the power grid, and
secure from switching on again. Only have trained
staff do this work.
Mind the operating instructions. Only perform this work when the system is at standstill.
Take the pump off power.
Switch off the fuse and put on warning signs.
The media in the system may scald you.
The hot surfaces may scald you.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Ax 12Ax 13Axw 10Axw 12Axw 13

Inhaltsverzeichnis