Herunterladen Diese Seite drucken

KERN IOC Serie Betriebsanleitung Seite 17

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5 Assembly of the platform
On the installation site observe the following:
• Place the platform on a firm, level surface.
The floor at the installation site must be able to carry safely the weight of the
maximally loaded platform at the resting points. At the same time it should
be sufficiently stable, that no vibrations may occur during weighing work.
• In the installation site possibly no vibrations, e.g. by neighbouring machines
should occur.
• Do not use the platform in an explosive environment.
• Avoid extreme heat as well as temperature fluctuation caused by installing
next to a radiator or in the direct sunlight.
• Protect the platform against direct draughts e.g. due to open windows and
doors.
• Use the platform only in dry environment, protect it against high humidity,
vapours and dust.
• Do not expose the device to extreme dampness for longer periods of time.
Non-permitted condensation (condensation of air humidity on the appliance)
may occur if a cold appliance is taken to a considerably warmer
environment. In this case, acclimatize the disconnected appliance for ca. 2
hours at room temperature.
• Avoid jarring during weighing.
• Avoid static charge of goods to be weighed or weighing container.
• Keep away chemicals (such as liquids or gasses), which could attack and
damage the balance inside or from outside.
• Keep IP protection of the device.
• Major display deviations (incorrect weighing results) may be experienced
should electromagnetic fields (e.g. due to mobile phones or radio
equipment), static electricity accumulations or instable power supply occur.
Change location or remove source of interference.
5.1 Levelling
Accurate weighing results require a platform with perfect horizontal alignment. During
initial installation and after each change of work area it is necessary to level the
platform.
6
 As the air bubble is located under the weighing plate,
remove it.
 Level balance with foot screws until the air bubble of
the water balance is in the prescribed circle.
IOC-BA-e-2111

Werbung

loading