Herunterladen Diese Seite drucken

Kessel Aqualift Comfort 400V Mono Einbau- Und Betriebsanleitung Seite 65

Inkl. der zusatzmodule sanftstart/ sanftstopp und frequenzumrichter
Vorschau ausblenden Andere Handbücher für Aqualift Comfort 400V Mono:

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5
Initial commissioning
5.1
Switch on and off
Connect the battery
Connect the battery connector(s) (2).
5.1.1
Connect to the mains voltage
Establish mains voltage (400V control units)
Connect the mains cable to the mains power supply.
Move main switch (1) into ON position.
Initialisation starts automatically.
010-532_02_SON
The device checks the electrical components.
Voltage test of the standby batteries.
Menu item
Switch on
Turn main switch (1) into ON position. After a successful sys-
tem test, the display shows
green LED signals readiness.
If the display does not show initialisation (
guage|
) the control unit has already been initialised. In
this case, the set parameters must be checked, or reset to
the factory settings (
the factory settings, the initialisation of the control unit starts
automatically.
Please note that the counter for the maintenance interval is
not changed by the resetting to the factory settings.
5.2
During initialisation, the following input is expected:
|Language|
|Date / Time|
|Product type|
|System variant|
|Power rating|
Installation and operating instructions
|3.10. Language|
|0 System info|
|3.11 Reset|
Carrying out initialisation
is displayed.
and the
|3.10. Lan-
). After resetting to
65 / 124

Werbung

loading

Diese Anleitung auch für:

Aqualift comfort 400v duo