d) G 1/2" under the bath tub, close to the inspection hole fi nished with ball valve G 1/2" (effective for the systems : Ele-
gance Hydro Pneu, Elegance Hydro Electronic, Elegance Hydroair Pneu, Elegance Magic Pneu)
8 - Built-in closing valve serves to control the disinfection and fl ushing of the systems Elegance Hydro Pneu, Elegance
Hydro Electronic, Elegance Hydroair Pneu, Elegance Magic Pneu.
2.
Preparatory Works scheme - fi g. 3
The hydromassage bath tubs are installed into the completely prepared space in the bathroom. All construction works must
be completed. The power supply, water connection and waste piping must be totally completed. Also fl oors and walls must
be completed and equiponderant. The tiles must be glued roughly 100 mm inside into the space under the bath tub.
Installation bathroom readiness using the cover panel - corner bath tub
1 - Possible outlet of wall tap
2 - Attachment of bath tub to the wall
3 - Space for outlet of warm and cold water (for pillar tap)
4 - Possible outlet of pillar tap
5 - Possible outlet of power supply (220V / 50 Hz). Necessary installations for hydromassage bath tubs of Elegance line
and additional system of FLUSHING and DESINFECTION
6 - Cold water outlet for disinfection and fl ushing
e) G3/4" under the bath tub, close to the inspection hole, fi nished with G 3/4" ball valve (effective for the systems : Basic,
Easy, Duo-Pneu, Duo, Duo Light, Excellent Hydro, Excellent Duo, Elegance Hydroair electronic, Elegance Magic Electronic)
f) G 1/2" under the bath tub, close to the inspection hole (effective for the systems : Elegance Hydro Pneu, Elegance Hydro
Electronic, Elegance Hydroair Pneu, Elegance Magic Pneu)
7 - Built-in closing valve serves to control the disinfection and fl ushing of the systems Elegance Hydro Pneu, Elegance
Hydro Electronic, Elegance Hydroair Pneu, Elegance Magic Pneu.
2.
Preparatory Works scheme - fi g. 4
The hydromassage bath tubs are installed into the completely prepared space in the bathroom. All construction works must
be completed. The power supply, water connection and waste piping must be totally completed. Also fl oors and walls must
be completed and equiponderant. The tiles must be glued roughly 100 mm inside into the space under the bath tub.
Installation bathroom readiness without using the cover panel - corner bath tub
1 - Possible outlet of wall tap
2 - Attachment of bath tub to the wall
3 - Space for outlet of warm and cold water (for pillar tap)
4 - Possible outlet of pillar tap
5 - Possible outlet of power supply (220V / 50 Hz)
6 - Installation holes with ventilation grid in the place of aggregates and controls. Necessary installations for hydromassage
bath tubs of Elegance line and additional system of FLUSHING and DESINFECTION
7 - Cold water outlet for disinfection and fl ushing
a) G3/4" under the bath tub, close to the inspection hole, fi nished with G 3/4" ball valve (effective for the systems : Basic,
Easy, Duo-Pneu, Duo, Duo Light, Excellent Hydro, Excellent Duo, Elegance Hydroair electronic, Elegance Magic Electronic)
b) G 1/2" under the bath tub, close to the inspection hole (effective for the systems : Elegance Hydro Pneu, Elegance Hydro
Electronic, Elegance Hydroair Pneu, Elegance Magic Pneu)
8 - Built-in closing valve serves to control the disinfection and fl ushing of the systems Elegance Hydro Pneu, Elegance
Hydro Electronic, Elegance Hydroair Pneu, Elegance Magic Pneu.
3.
Attachment of the bath tub to the wall - fi g. 5
The installation kit contains:
fi ttings
fi ttings with wing nut
wall plug (dia. 8)
screw (40 x 40)
washer (dia. 6)
1. FITTINGS
2. FITTINGS WITH WING NUT
2 pcs
2 pcs
8 pcs
8 pcs
8 pcs
11