Herunterladen Diese Seite drucken

NOESIS Florio F10 Pro Bedienungsanleitung Seite 17

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 32
BASE STATION PREPARATION
BASE STATION PREPARATION
1. Remove the packaging tapes
1. Remove the packaging tapes
Remove all tape from the front cover and mop pad
boxes in the base station.
4. Place and power on
4. Place
and power on the base station
the base station
Place the base station against the wall and connect
the power.
Please ensure enough space on each side of the
base station as shown below.
*The base station will be reset when it is powered on. Please do not place the robot in the base station at this time.
EN
2. Insert power cord into the base station
2. Insert power cord into the base station
Take out the power cord and then insert it into the
base station (please insert the power cord firmly).
5. Install mop tray
5. Install mop tray
Push the mop tray into the back of the base station.
Follow the directional arrow on the tray.
NOTE: The robot will provide a voice alert letting you
know if installation was successful.
3. Install guide plate
3. Install guide plate
Align the buckles of guide plate with the slots in
front of the base station and snap to install as
shown.
6. Install the fragrance cube
6. Install the fragrance cube
Remove the fragrance cube from the packaging
and place it into the base station.
17

Werbung

loading

Diese Anleitung auch für:

Nr200e