Herunterladen Diese Seite drucken

wohner OMUS 30Compact Betriebsanleitung Seite 16

Elektronischer hybridschalter für ohmsche lasten.

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
8. Application
8.1 Block diagram
L1
L1 in
F1
Measurement 1
L2
L2 in
F2
Measurement 2
L3
L3 in
F3
Measurement 3
Detection of 0
crossing
Internal control with synchronisation and
semi- conductor sequential control – mechanical contacts
18 - 30VDC
Control inputs L1, L2, L3, all
• Isolation of main , operating and control circuits
• 3 × Independent circuits 25 A L1, L2, L3
• All connections plug-in
8.2 Switching variants
L1: 1
L2: 1
L3: 1
OMUS®
OMUS®
N: 1
For applications without a neutral conductor, the
switching cycle must affect all poles L1+L2+L3.
30
Triac L1
Load
L1 out
Relay A L1
L1
Triac L2
Load
Relay A L2
L2 out
L2
Triac L3
Load
Relay A L3
L3 out
L3
Error
detection
Error message
OMUS®
OMUS®
Applications the load against
Not suitable for operation in
the neutral conductor can be
1-phase networks.
switched as required
(individually or together).
8.3 Eplan symbol
1 L1
3 L2
1
1
2
2
A1
A2
2 T1
4 T2
9. Function description
9.1 General
The OMUS® hybrid switch has four function sections
with staged priority.
1. The normal working functions of delivery condition,
commissioning, operation, interruption, standby in
manual mode at the lowest priority.
2. The setting functions "select", "change" and "enter"
have priority over the working functions.
3. Warnings are indicated if a dangerous condition such
as overtemperature, failure to control commands,
overcurrent or phase failure are active or threatened.
4. Exceeding critical limits has the highest priority. In
this case the devices shut down and the error
message activated.
9.2 Working functions
Factory setting: On delivery all phases are set to
automatic mode and the current limits to 25A. The
hybrid switch can be returned to factory settings by
pressing "select" + "enter" at the same time.
Revision 0, stand 05.2016
English.
5 L3
1
2
A1
A1
A2
A2
ATmega1280
6 T3
U5 Steckverbinder
Control plug
1 ... 12
Commissioning: The connections of the controller and
mains can be connected in any order: If only control
voltage is connected, phase failure (Main LED yellow,
Auto LED green, current limit 1 × green) is indicated, the
device will not switch.
If only the main circuits are connected, the loads
receive no energy, all LEDs are off, the signal contact
indicates error.
Ready: Ready means that all voltages are connected,
no internal overtemperature, there is no constraint
between actuation and command completion, the
measured currents are below the set limits and no
setting processes required at the current time. Green
continuous light means: No error message, no warning.
The operating switch on and off processes are not
displayed separately to ensure a clear distinction
between warnings and errors.
Interruption: If the 24V operating voltage is interrupt-
ed, the loads are shut down in an orderly manner. All
LEDs are off, the PLC receives an error message but no
warning message.
31

Werbung

loading

Verwandte Produkte für wohner OMUS 30Compact

Diese Anleitung auch für:

Omus 60classic