Herunterladen Inhalt Inhalt Diese Seite drucken

Flushing After Expansion Foam Operation - Rosenbauer Rte Ax B16 Betriebsanleitung

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

20.5.3

Flushing after expansion foam operation

The flushing procedure must be carried out after each foam operation, as
well as after every operation with seawater or dirty water.
Stop foam supply.
Producing water mist on the high performance fan.
Flush for as long until pure water flows out of the high performance fan.
Dismantle foam net and air tube.
Dismantle proportioner.
Allow high performance fan to cool down.
Remove foam compound residues with a light spray jet.
The flushing procedure is completed.
Operation
Operation with water vapour cartridge
DE
EN
L03
L04
L05
L06
L07
L08
L09
L10
L11
L12
85 / 97

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

68206a-001

Inhaltsverzeichnis