Herunterladen Diese Seite drucken

EuroLite LED MS-3 Laser-LED-Effekt Bedienungsanleitung Seite 24

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Before rigging make sure that the installation area can hold a minimum point load of 10 times the device's
weight.
When installing the device, make sure there is no highly-inflammable
material (decoration articles, etc.) within a distance of min. 0.5 m.
Mount the device to your trussing system using an appropriate clamp.
For overhead use, always install an appropriate safety bond.
You must only use safety bonds complying with DIN 56927, quick links complying with DIN 56927, shackles
complying with DIN EN 1677-1 and BGV C1 carbines. The safety bonds, quick links, shackles and the
carbines must be sufficiently dimensioned and used correctly in accordance with the latest industrial safety
regulations (e. g. BGV C1, BGI 810-3).
Please note: for overhead rigging in public or industrial areas, a series of safety instructions have to be
followed that this manual can only give in part. The operator must therefore inform himself on the current
safety instructions and consider them.
The manufacturer cannot be made liable for damages caused by incorrect installations or insufficient safety
precautions!
Lead the safety bond through the mounting-bracket of the device and over the trussing system or a safe
fixation spot. Insert the end in the quick link and tighten the safety screw.
The maximum drop distance must never exceed 20 cm.
A safety bond which already hold the strain of a crash or which is defective must not be used again.
Adjust the desired inclination-angle via the mounting-bracket and tighten the fixation screws.
Before taking into operation for the first time, the installation has to be approved by an expert!
5.2 Attachment at the wall/ceiling
Do only use appropriate screws and make sure that the screws are properly connected with the ground.
The durability of the installation depends very much on the material used at the installation area (building
material) such as wood, concrete, gas concrete, brick etc. This is why the fixing material must be chosen to
suit the wall material. Always ask a specialist for the correct plug/screw combination indicating the maximum
load and the building material.
5.3 Connection with the mains
Connect the device to the mains with the enclosed power supply cable.
The occupation of the connection-cables is as follows:
Cable
Pin
Brown
Live
Blue
Neutral
Yellow/Green
Earth
The earth has to be connected!
DANGER OF FIRE!
DANGER TO LIFE!
International
L
N
24/26
00054554.DOC, Version 1.0

Werbung

loading