Herunterladen Inhalt Inhalt Diese Seite drucken

Checks; Maintenance - SCHUNK ELB Montage- Und Betriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Maintenance

98

7.2 Checks

1.
Regularly check all electrical connections for firm seating.
2.
Regularly check cable for damage. Shut down the automated
system in the event of defects and replace the cables.
7.3 Maintenance
CAUTION
Ensure that the guides are sufficiently lubricated. Perform the
maximum stroke at least once a day.
CAUTION
To ensure the operational safety of the product over a long
period of time, the operating personnel must carry out
maintenance work in specific intervals.
Interval
2,500 km
However, after six months
at the latest
Activity
Lubrication of the axes with special
grease
(ID number GAS364056)
Lubricating procedure:
Evenly distribute a thin layer of
l
grease on both sides of the
running surface using CleanTips.
Move the axis several times over
l
the maximum stroke length.
Clean and slightly grease the
l
brake shaft.
09.00 | ELB | Assembly and Operating Manual | de en | GAS 376437

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis