Herunterladen Inhalt Inhalt Diese Seite drucken

Connecting The Battery Cable - Bosch BPT-S Hybrid Installationsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

English
DANGER
Bosch Power Tec GmbH
Earthing between components
Floor panel to the housing
Internal distribution box to the distribution
box cover

6.14 Connecting the battery cable

Risk of fatal injury due to voltage
As soon as the battery cable is connected to the
BMM, the system is live.
Before starting work:
Disconnect the system Ensure that it is secured
against being switched back on Verify that the
system is fully de-energised Earth and short-circuit
the system Cover or shield any adjacent
components
Procedure
1. Connect the red battery cable protruding from the
battery cover opening to the BAT+ and BAT-
battery power terminals on the BMM
BMM: Connect the battery cable to the BAT+ (1)
6.30:
and BAT- (2) terminals
Carry out measurements according to DIN EN 62446,
in order to ensure that the components are
connected correctly.
The battery cable is connected to the battery
management module.
Installation | 91
Earthing cable
2W9 cable
2W30 cable
(1)
(2)
Storage system | Installation manual

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis