Herunterladen Inhalt Inhalt Diese Seite drucken

Bosch BPT-S Hybrid Installationsanleitung Seite 213

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

English
Bosch Power Tec GmbH
2. Stack the batteries in the battery tray with the
connections facing forwards
Stack the batteries as far to the back of the
battery tray as possible
6.11:
Pull the battery tray forwards, then stack the
batteries
Once all the batteries are stacked, the next step is
to connect them to each other
3. Connect the long flat cable (1) to the top battery
4. Connect the batteries to the short flat cables (2)
Connect the cables from the bottom to the top
connection between each battery respectively
5. Connect the terminating resistor (3) to the bottom
terminal
Installation | 69
Storage system | Installation manual

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Inhaltsverzeichnis