Connect the oven to the gas line with the proper
type of gas according to Local and National Instal-
lation Standards.
Setting Equipment for Other Types of Gas --
1000 Series Only
NOTE: The 900 Series ovens are not convertible.
Data given on the following page is for in-
formation only.
1. Shut off the gas valve and turn off the operat-
ing switch.
2. Dismantle the manifold by means of a cou-
pling. Remove the bolts holding the manifold
to the brackets. Remove the manifold.
3. Replace the injectors.
4. Adjust the air shutters to the proper air open-
ing. Refer to the table on the following page.
5. Reinstall the manifold.
Air Shutter
Pressure Tap
Air Shutter
Thermocouple
Manifold
Figure 7
7
Installation
Gas Connection and Initial Startup
6. Remove the two screws holding the pilot
bracket.
7. Remove the pilot tube from the pilot assembly.
8. Loosen the set screw on the left side of the pi-
lot bracket. Remove the thermocouple. Re-
move the pilot bracket assembly.
9. Insert the thermocouple into the new pilot
bracket assembly. Tighten the set screw.
10. Install the new pilot bracket assembly with the
screws removed in step 6.
11. Install the pilot tube in the new pilot bracket as-
sembly.
INITIAL STARTUP
1. All the oven to burn off for four hours. Set the
thermostat to 140_C. Increase the tempera-
ture by 55_ every hour up to 315_C. This pro-
cedure may produce smoke.
Pilot bracket
Set Screw
Pilot Tube