Herunterladen Inhalt Inhalt Diese Seite drucken

Transporting The Mini Bead Mill - VWR Mini Bead Mill Benutzerhandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 35

Transporting the Mini Bead Mill

The Mini Bead Mill must be shipped in its original packaging.
Before transporting please follow these steps.
1.
2.
1.
10
Remove all tubes, and cover the unit in its plastic bag.
The tube carriage will slide back. Lift the tube
carriage to align the motor mount holes to the
holes in the base plate.
Insert screws with Allen key until you feel them
engage (It may take some adjusting to get them
aligned with the threads in the unit).
2.
Tighten screws until completely seated.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis